As a company, Red Fork Production is in the business of Resource Balancing. We are deeply affected by the balance of nature, both above ground and below. We work very closely with our land and our mineral owners, and are very careful to create a positive impact in our operations. We exercise more care and prudence than is expected of us by the various regulatory agencies, not because we are forced, but because we believe. We initiate, develop and maintain a mutually beneficial relationship with our surface and mineral resource partners. We are cognizant of their concerns, and we initiate many permanent improvements to their domain. In addition, all phases of our operations are geared toward protecting the Asset, and we exercise every practice to conserve and maximize reservoir drainage to achieve the greatest recovery of our planet’s scarce hydrocarbon reserves.
2006
12.29.2006
Devilver and spread one load 1 ½” Class A material for Grace # 25-3 wellsite.
12.28.2006
Move in Workover rig to Grace # 25-1 well. Pulled rods and pump out of hole. Run new pump and rods back in, seat pump and calibrate stroke. Hang well on Jack. Rig down W/O unit, leave location.
12.18.2006
Build tank battery pad, place tanks and equipment for Newby # 6-1 well.
12.15.2006
Semcrude Transport Truck 4015 picks up first load(s) Grace # 25-1 oil, Red Fork Production Tank # 1, Okfuskee Co., Oklahoma @ 07:04. Observed API of oil is 38.6 degrees. BS&W % = 0.05%
[ Ticket # 279538 ]
12.14.2006
Move in Electric Wireline to Newby # 6-1 well, run Cement Bond Log.
11.28.2006
Arrive @ Test Depth, drilling complete on Newby # 6-1 well. Run logs, cement casing. Rig down.
11.16.2006
Drag in Drilling Rig and ancillary support equipment with D-6 Dozer, spud and commence drilling Newby # 6-1 well.
11.15.2006
Pull polish rod out of Hunn # 34-1 well. Run in hole with new pump and rods. Seat and respace pump and pump action. Hang well on.
11.14.2006
D-6 Dozer build location, work and reserve pits on Newby # 6-1.
Move in rig up Workover unit on Hunn # 34-1. Unseat pump and pull rods and pump out of hole. Pack well off. Shut in.
Blow King # 23-1 well down. Tubing swab well. Run in and install new pump, rods and seat. Hang well on and start Pump Jack.
Deliver one load 1 ½“ crusher run for Grace # 25-3 location.
11.13.2006
Deliver one load 1 ½” crusher run for Newby # 6-1 location.
Arrive King # 23-1, hook pump truck up to casing and circulate hole clean. Pull tubing bit sub and bit out of hole. Rig up Electric Wireline unit, perforate Gilcrease sand. Run in tubing to TD, circulate 65 Bbls clean salt water to pit. Pull 3 swabs.
11.10.2006
Blow well down and run in with swab on King # 23-1, hit plug @ 2,800’. Run tubing to TD, pull out. Rig down.
11.9.2006
Move in Reverse Circulation unit to King # 23-1 well, with new bit and tubing to drill out sand. Hit CIBP @ 2,703’, drilled plug out and clean out to 2,800’. Pull tubing, collars and bit out of hole.
11.8.2006
Move Workover Rig into King # 23-1, run in with sand line drill and pump, tagged sand, beat on plug, not able to move it. Pull out of hole.
11.6.2006
The electricians are finished hooking up the Pump Jack on the Grace # 25-1 well, and we flipped the switch, turning on the well at 6 in the evening. Stayed with the well, monitoring pump action till 9PM, at which time the electricity was turned off.
10.31.2006
Grace # 25-2 well making gas, increasing large amounts of salt water. Collect representative samples for analysis, shut in well, rig down Workover unit.
10.30.2006
Rig up Workover unit and Electric Wireline unit on Grace # 25-2 well. Run Cement Bond Log, Perforate. Casing swab well down. Show of gas, increasing salt water. Break Orbit Valve off, install swage. Secure, shut in well.
10.28.2006
Move in Workover unit to Grace # 25-1. Install Orbit Valve on casing, swab well down. Install tubing head. Run pump, rods and tubing back in hole. Hang well on Jack. Rig down W/O unit.
10.26.2006
Move in Workover unit to King # 23-1, pull rods and tubing out of hole. Pack well off, secure and shut in.
10.25.2006
Blow down Hunn # 34-2, run mud anchor, seating nipple and tubing back in hole. Run new pump and rods back in hole. Seat and re-space pump, check movement. Hang well on Jack.
10.24.2006
Move in Workover rig to Hunn # 34-2. Pull rods and pump out of hole. Blow down casing. Pull tubing, seating nipple and mud anchor out of hole. Shut well in.
10.23.2006
Install tubing head on Grace # 25-3 casing. Blow down well. Run in hole with mud anchor, seating nipple and tubing. Pack well head off. Run new pump and rods. Seat and space out pump. Check and calibrate action. Clamp well off. W/O rig leave location.
10.21.2006
Rig up Workover unit on Grace # 25-3, blow well down. Rained out. Secure well.
10.20.2006
Rig up Workover unit on Grace # 25-3 well. Run casing swab, testing levels every 30 minutes. Shut well in, leave location.
10.19.2006
Move frac equipment over to Grace # 25-3 well and conduct Hydraulic Acid stimulation on Union Valley formation.
Conduct Hydraulic Fracture treatment on Grace # 25-1 well in the Union Valley.
Rig up Workover unit on Grace # 25-3. Rig up Electric Wireline unit, perforate well. Casing swab well down. Rig up and conduct acid treatment on well. Swab well down. Install swege and valve in casing.
10.18.2006
Rig up Workover unit on Grace # 25-2 well. Blow down gas off casing. Catch fluid samples for lab. Pull rods and pump and tubing out of hole. Break wellhead off and replace with swege and valve in casing for sample point. Secure, shut well in.
9.18.2006
Repair electrical box controller for Salt Water Disposal well for Hunn lease.
9.16.2006
Blow tubing and casing down on King # 23-1. Pull rest of tubing out of hole. Rig up Sand Pump and bail sand out of hole. Run seating nipple, mud anchor and tubing back in hole. Run new pump and rods in hole. Load tubing with water, check action, hang well on Jack. Secure well.
9.15.2006
Rig up Workover unit on King # 23-1, pull rods and pump out of hole, inspect for sand damage. Pull 60 joints tubing out of hole. Shut well in.
9.13.2006
Arrive @ Test Depth, drilling complete on Grace # 25-3 well. Rig up and run Electric Logs, cement Production Casing into hole.
9.8.2006
Start Pump Jack and turn Hunn # 34-2 to sales.
Connect Grace # 25-1 well to electric source.
9.6.2006
Move in Drilling Rig, spud and commence drilling Grace # 25-3 well.
Finish flowlines and install Pump Jack on Hunn # 34-2 well.
9.5.2006
Deliver one load 3” rock and two loads 1 ½” crusher run to Grace # 25-3.
Move Drilling Rig to Grace # 25-3, commence drilling.
9.4.2006
Arrive @ Test Depth on Grace # 25-2, rig up and run Electric Wireline unit, conduct Electric Log suite, including Gamma Ray, Compensated Neutron, Lithology Density, Caliper, Induction Tool and Micro Log. Cement Production Casing in hole. Rig down Drilling Rig.
9.1.2006
Finish running tubing, rods and pump into Hunn # 34-2 well. Seat and space pump. Calibrate pump action. Rig down.
8.31.2006
D-6 Dozer works through heavy timber to build road, creek crossing, location, working pits and to spread and embed rock on Grace # 25-3 drill site (6 days).
Move Workover Rig onto Hunn # 34-1. Run mud anchor, seating nipple, and tubing into hole. Run rods and pump into hole. Set and adjust.
Move Workover Rig back onto Hunn # 34-2, run tubing into well. Trench and Lay flowline to sales gathering facility.
Survey well location and well elevation for Grace # 25-3 well.
8.28.2006
Move in Drilling Rig, commence drilling Grace # 25-2 well.
8.24.2006
Arrive Hunn # 34-2 well, blow down gas. Hook up and continue casing swabbing operations, checking fluid levels. Rig down Workover Rig.
8.23.2006
Semcrude Transport Truck 4015 picks up first load(s) Grace # 25-1 oil, Red Fork Production Tank # 1, Okfuskee Co., Oklahoma @ 07:04. Observed API of oil is 38.6 degrees. BS&W % = 0.05% [ Ticket # 1820123]
Continue casing swab on Hunn # 34-2 well. Rig up Electric Wireline unit, run Cement Bond Log . Pull out, run back in and Perforate Union Valley Lime. Casing swab well back to test tank. Inject 1,000 gallons of 15% HCL acid. Test swab back every 30 minutes. Shut in, secure well.
8.21.2006
Rig up Workover unit on Hunn # 34-3, swab well down to 600’. Rig up Electric Wireline unit, run in hole and perforate. Well kicked and starts flowing. Loaded up. Swab well down to 1,485’. Rig down W/O unit.
Rig up Workover unit on Hunn # 34-2, rig up Electric Line, run Cement Bond Log, swab well down through casing. Perforate well in Union Valley Limestone. Swab well.
8.19.2006
Deliver and spread one load 3” Class A surface material to Grace # 25-1.
8.10.2006
Deliver and spread 2 loads 1 ½” Screenings to Grace # 25-1 location.
8.9.2006
Deliver and spread 2 loads 1 ½” Screenings to Grace # 25-1 location.
7.30.2006
Arrive @ Test Depth, drilling complete on Hunn # 34-3 well. Rig up Electric Logging unit, run logs. Cement Production Casing into well. Rig Down.
7.28.2006
Move in Drilling Rig, spud and commence drilling Hunn # 34-3 well.
7.26.2006
Survey well location and well elevation, stake drillsite for Grace # 25-2.
Deliver and spead one load 1 ½” class A material to Grace # 25-1.
Run Electric Logs, Cement Casing in Hunn # 34-2 well.
7.25.2006
Arrive @ Test Depth, drilling complete on Hunn # 34-2 well.
7.21.2006
Move Workover rig to Grace # 25-1 well, run mud anchor, seating nipple, and tubing into hole. Pack off well and sun new pump and rods and sub in hole. Seat and space out pump. Rig down.
7.19.2006
Move in Drilling Rig, spud and commence drilling Hunn # 34-2 well.
Blow Grace # 25-1 well down, continue casing swab. Tagged fluid @ 650’. Continue test swabs. Shut in well.
7.18.2006
Hook up and continue to run casing swab on Grace # 25-1 well. Swab well down, had good show of oil and gas. Rig up pump trucks, conduct Acid job on injecting 500 Gallons 10% HCL acid. Continue to casing swab acid back. Shut in well.
7.17.2006
Move Workover rig to Grace # 25-1 well. Conduct casing swabs. Connect flow line from well to test tank. Casing swab well down. Shut in well.
7.10.2006
Rewire Electrical Panel and restart grid after lightning strike caused power failure on Hunn lease.
6.29.2006
Survey well locations and well elevations and stake drillsites for both the Newby # 6-1 and for the Hunn # 34-2
6.19.2006
D-6 clearing hillside up to Grace # 25-1, and ferrying random vehicles to and from 1 wellsite.
6.18.2006
un Electric Logs, Cement Casing in Grace # 25-1 well. D-6 Dozer pulls logging truck, pipe truck, cementers and other vehicles (due to rains) off steep hill entrance to Grace # 25-1.
6.17.2006
Arrive @ Test Depth, drilling complete on Grace # 25-1 well.
6.7.2006
Move in Drilling Rig, spud and commence drilling Grace # 25-1 well.
4.26.2006
Enogex line repaired, bring Hunn wells back on.
4.21.2006
Enogex Pipeline has problem with their Master sales line. Operators up and down line are forced to shut in wells, including Red Fork.
4.20.2006
Survey well location and well elevation, stake drillsite for Grace # 25-1.
4.17.2006
Electric underground line cut, shuts Hunn field down. Repaired, wells back on line (10 hours).
4.16.2006
Finish installing rods on Hunn # 34-1. Hook up well head.
4.12.2006
Return to Hunn # 34-1. 540# on surface, blow down gas. Finish running 50 more joints tubing, install new pump with rods back in hole. Seat and space pump. Check pump action, hang well on. Rig down.
4.11.2006
Swab Hunn # 34-1 well dry, unseat packer, pull tubing. Re-run seating nipple, mud anchor and 74 joint of tubing back in hole, well kicks. Pack well off, secure and shut well in.
4.10.2006
Move in Electric Wireline unit to Hunn # 34-1 well, Perforate Union Valley Lime, 4 shots per foot. Run in tubing and set packer with Workover unit. Pump Acid stimulation treatment. Tubing swab back acid. Shut well in.
4.8.2006
Move in Workover rig to Hunn # 34-1, pull tubing and rods.
4.7.2006
Bail another 35’ of sand out of King # 23-1. Run in hole with new mud anchor and new pump. Run tubing and rods back in, seat and space pump. Load tubing with water. Check pump action. Hang well on Jack, turn to sales.
4.6.2006
Continue pulling tubing out of King # 23-1 well. Bail 25’ of sand.
4.5.2006
Move Workover rig into King # 23-1 well, pull rods and pump out of hole. Hook up and swab well in through tubing. Shut well in.
3.9.2006
With Workover unit, long stroke pump on King # 23-1 well. Showed good, free motion. Hang well back on. Turn to sales. Rig down.
3.8.2006
Run tubing in hole on King # 23-1 and commence tubing swab runs till dry. Replace flowline. Run new seat, pump and rods into hole. Space pump and clock action. Hang well off. Turn to sales.
3.7.2006
Return to King # 23-1 well, flow pressure off. Run sand pump. Cleaned out sand to 2,585’. Lay down sand pump. Shut in well.
3.6.2006
Perform Hydraulic Fracture Treatment on King # 23-1 well in Gilcrease formation. Flow well back into pit. Go in hole with Sand Pump with Workover unit, bail sand. Shut in well.
3.2.2006
Move Workover rig onto King # 23-1 well, pull rods and pump out of hole. Pull tubing out of hole. Take wellhead off and put swage and Orbit Valve on casing. Secure well.
2.11.2006
Broke rest of rods down to doubles, install them in King # 23-1 well. Seat and space out pump, check pump stroke, hang well on. Plumb and turn well to sales.
2.10.2006
Rig up Workover rig on King # 23-1 well. Blow well down. Run rods in hole. Shut in well.
2.1.2006
Flowing King # 23-1 to sales at different adjustable rates for production test.
1.26.2006
Hook up and flow King # 23-1 to sales line, producing gas.
1.21.2006
Flowing King # 23-1 well to pit, unloading fluids, then dry gas. Rig down Workover unit.
1.20.2006
Set CIBP plug @ 2,705’ on King # 23-1 well, load casing to kill. Rig up Electric Wireline unit, run in hole and perforate third Gilcrease sand. Run in with Seating Nipple and tubing and set @ 2,580’. Swab well dry. Rig up and Acidize. Swab back acid.
1.19.2006
Conduct swabbing runs on King # 23-1 well till dry. Unseat packer. Lay down 42 joints. Pull 8 stands and reset Packer @ 3,208’. Isolate upper perfs, swab well. Pull tubing and packer out of hole, lay down tubing. Shut in.
1.18.2006
Blow down King # 23-1 well. Load Casing with kill fluids. Pull tubing and rods out of well. Rig up Electric Wireline unit, load hole and perforate Gilcrease sand. Pull out of hole with guns, re-arm, run back in hole and perforate second Gilcrease sand. Well blows guns out of hole. Bleed off pressure. Run in with tubing and swab well.
1.17.2006
Rig up Workover rig on King # 23-1 well. Unseat pump. Pull rods & pump. Shut well in.