As a company, Red Fork Production is in the business of Resource Balancing. We are deeply affected by the balance of nature, both above ground and below. We work very closely with our land and our mineral owners, and are very careful to create a positive impact in our operations. We exercise more care and prudence than is expected of us by the various regulatory agencies, not because we are forced, but because we believe. We initiate, develop and maintain a mutually beneficial relationship with our surface and mineral resource partners. We are cognizant of their concerns, and we initiate many permanent improvements to their domain. In addition, all phases of our operations are geared toward protecting the Asset, and we exercise every practice to conserve and maximize reservoir drainage to achieve the greatest recovery of our planet’s scarce hydrocarbon reserves.
2008
12.31.2008
Finish foundation dirt pad on production facility for Newby # 6-3. Begin to move in rock and gravel for final pad preparation.
12.30.2008
< Sold load of oil off Newby # 6-1 >
12.28.2008
Deliver more fill dirt for production facility pad on Newby # 6-3.
12.27.2008
< Sold load of oil off Newby # 6-2 >
Dozer spreading dirt and fill on Newby # 6-3 road and production facility pad.
12.26.2008
Deliver dozer and more loads of fill dirt to Newby # 6-3. Begin construction on pad for production facility.
12.23.2008
Deliver first load of fill dirt to Newby # 6-3 for production facility foundation.
12.22.2008
< Sold load of oil off Grace # 24-1 >
Install new Gas Master Meter on Hunn lease.
Trace source of leak on Hunn Salt Water Disposal facility to underground water line; Lease crew with backhoe repair line and tank.
12.21.2008
< Sold load of oil off Grace # 25-4 >
12.20.2008
Workover crew arrive Newby # 6-3, prepare the rig. Transport Truck deliver, spot and offload pump and rods for Workover rig. Run in hole with downhole pump and rods. Worked rod string with W/O unit to prime wellbore. Lay rig over, secure well, leave location. Bad weather supposed to hit Monday, 12/22 but we will attempt delivery of Gun Barrels, Separator, Oil and Water Tanks and Pump Jack. Also will start bringing 20 loads of foundation materials so that Dozer can continue work on Pad for Production Facility.
12.19.2008
Move in Fluid Kill Truck to Newby # 6-3 to be available for emergency pump in, if needed. Transport bringing tubing arrives, offload with fork lift. Move in Workover unit, rig up over well. Perform 10 minute blow down on well. Rig up, run tubing into well. Secure well, leave location.
12.18.2008
Lease crew performs general maintenance on Grace lease, including winterize procedures. Cold fronts coming, sub-teen degree weather.
Dwayne Smith & Johnny Leslie out to the Newby # 6-3 location and lease to spot and position where production facilities will be. Getting with dozer driver, lease crew and land owner to initiate construction on area.
12.17.2008
Had Dwayne Smith check Newby # 6-3. Surface Pressure @ wellhead is 40 psi. Pressure coming down is sign oil column in casing continues to rise. Good sign as it indicates reservoir is strong enough to continue to lift oil up thousands of feet of 4 ½” Casing free style.
< Sold load oil off Newby # 6-1 >
Repair Salt Water Transfer pump at Hunn Lease and activate, monitor results. OK.
Lease Crew finish general maintenance & cleaning of Hunn Production facility. Perform cold calibration tests on dump valves, etc. Found and repaired 6” split in Hunn # 34 – 1 underground discharge pipeline.
12.16.2008
Lease Crew and Winch Truck go to Hunn Production Facility and work on equipment, do maintenance while prices low. Replaced float on inlet separator, and repaired or replaced all rubbers, gaskets, O rings and other repair kit items for valves and such.
Pumper for Newby area goes by inspects Newby # 6-3 for leaks, safety, pressure. Surface pressure is 70 psi. Good sign in oil well when surface pressure falls. Means fluids coming into wellbore are “killing” the well by loading it up.
12.15.2008
Lease Crew travel to Hunn Lease, perform inspection and maintenance of wells, Salt Water Disposal facility, Production Facility, Compressor, meter runs, Pump Jacks and well head enclosures.
12.13.2008
Pumper checks Newby # 6-3 well as it is live but shut-in, waiting on hook up. Pressure is at 80 psi on surface but could be coming down.
12.12.2008
Move in to Newby # 6-3 well and rig up Workover Unit for swabbing operations. Zero pressure on surface. Run in hole, hit fluid @ 50’. Continue to descend to 350’ with swab tool to bring up 300’ of fluid. Pull 300’ column to surface, 100% of fluid live oil. Make 2nd run, hit fluid @ 100’, continue down and get another 300’ bite, pull from 400’. 300’ column fluid, sample 100% live oil. Make three more runs, each bringing 300’ column of fluid up, each sample 100% live oil. Never got below 450’ because of feed-in. Increasing gas blow, had to shut in well for safety and to prevent blowout. Rig down Workover Unit, arrange for tubulars and rods and downhole motor and pump jack. Secure well.
Hauled load of Salt Water from Newby tank battery to disposal.
12.11.2008
Deliver and change out 1 drum of E-421 Emulsion Breaker and 1drum of TVA to Grace # 24-1. Calibrate injection rates.
Sunoco turned down load of oil on Newby # 6-1, too much BS&W. Cold weather & Wilcox oil not a good mix. Deliver sample to chemical man.
12.10.2008
Grace # 25-6 still shut in, took electrical parts for repair, replacement..
12.9.2008
Grace # 25-1 Pump Jack engine struck by lightning. Safety shut in.
Grace # 25-6 made 1.67 BO but was shut in, belts had come off during Thunder Storms. Secured well, remove affected parts f/replacement.
12.8.2008
Senior meter tech calibrated Barton meters on Hunn Lease.
12.7.2008
Haul off load of Salt Water from Grace Production facility.
12.5.2008
< Sold a load of oil off of Newby 6-2 >
12.3.2008
< Sold a load of oil off Grace # 24-1 >
Hauled load of Salt Water from Newby tank battery to disposal.
11.30.2008
Grace # 24-1 made 8.35 BO, shut down, service & winterize unit.
11.29.2008
Grace # 25-4 made 13.36 BO + 54 MCF/D, shut down, service & winterize unit.
11.28.2008
Grace # 25-1 making 2.55 BO. Shut down and service, winterize unit.
Replaced grease hose on saddle bearing on Grace # 25-3 pumping unit.
Changed oil and pulled shim on rod bearing on Grace # 25-6. Well is making 2-4 BOPD.
11.27.2008
< Sold load of oil on Newby # 6-1>
Shut down, service and winterize pumping unit on Grace # 25-3.
11.26.2008
Grace # 25-4 making 19.2 BO + 54 MCF/D. < Sold load of oil >
Installed electric timer on Grace # 25-3. It will operate to auto cycle the pump for 4 hours on, and then go off for 1 hour.
11.24.2008
Continue to maintain and fill in washouts from runoff at Hunn lease and at Hunn salt water disposal well with shale.
11.21.2008
Fill in washouts and reinforce shoulders of lease roads on Hunn lease with road base and Shale
11.20.2008
Deliver and spot 2 more loads of road base Shale to Hunn lease. .
11.19.2008
Grace # 25- 6 made 6.68 BO. Replace radiator hose, refill chamber w/ anti-freeze. Adjust flow .
Grace # 25-4 made 16.70 BO & 57 MCF/G.< Sold load of oil >
11.18.2008
Grace # 25-6 made 5.01 BO in 10 hrs; switch it over to natural gas, shut down propane.
11.17.2008
Start and cycle Grace # 25-6 with new Pump Jack, at 1PM with propane.
11.15.2008
Connect and adjust Pump Jack and re-start Grace # 25-3.
11.14.2008
Finished moving accessories from King lease to Grace # 25-6.
Change out dump valves on Newby lease separators
Disposal truck to Newby lease, haul off 120 Bbls. salt water.
11.13.2008
< Sold load of oil off Newby # 6-1 >
11.12.2008
Monty Ross dissemble Pump Jack from King lease, move to Grace # 25-6.
11.11.2008
Grace # 25-1 made 20.04 BO + 20 MCF/G.< Sold load of oil >
Grace # 24-1 made 8.35 BO. < Sold load of oil >
11.10.2008
< Sold load of oil off Newby # 6-2 >
Spread shale and patch washouts on and around Disposal facility.
11.9.2008
Spread shale on and around Hunn entrance and on road to Disposal facility.
11.8.2008
Spread shale on roads and pad on Hunn # 34-3 well.
11.5.2008
Adjust Grace # 25-4 to 20.39 BO + 22 MCF/G.
11.4.2008
Spread shale on roads and entrance to Hunn # 34-2 well.
Spread shale on roads into Hunn # 34-2 and Hunn # 34-3 wells.
11.3.2008
Cut rate back on Grace # 24-1 to 9.18 BO because of low priced oil.
Cut rate back on Grace # 25-4 to 21.71 BO + 23 MCF/G because of low prices.
11.2.2008
Deliver and spot 10 loads of Shale to Hunn lease for road and location upkeep and patch.
10.30.2008
White Metal Sandblasting crews finish detailing Wilson Co. pump jack.
10.29.2008
White Metal Sandblasting crews finish detailing Grace Section pump jacks.
10.27.2008
White Metal Sandblasting crews finish detailing Newby pump jacks.
10.26.2008
Sold load of oil of Newby # 6-1.
10.25.2008
Shut in Grace # 25-4 to service pumping unit. Sold load of oil off of Grace # 25-4.
Shut in Grace # 24-1 to service pumping unit.
10.22.2008
Shut in Grace # 24-1 and change out meters.
10.22.2008
Shut in Grace # 24-1 and change out meters.
10.22.2008
Shut in Grace # 24-1 and change out meters.
10.21.2008
White Metal Sandblasting crews painting Newby facilities.
10.20.2008
White Metal Sandblasting crews working at Newby painting facilities.
Enogex issues Systems Operations Order announcing that they are going to restrict all gas purchases “until further notice.” This affects all Operators and is probably triggered by current natural gas prices.
10.18.2008
White Metal Sandblasting crews working at Newby painting facilities.
10.17.2008
Sold load of oil off the Newby # 6-2.
Sold load of oil off the Newby # 6-1.
Sales line pressure on Enogex pipeline on Hunn lease excessive. Causing every ones sales to be inhibited.
10.16.2008
Finish roadwork leveling and drainage on Grace # 24-1 with Bulldozer.
10.15.2008
Continue to do earthwork and civil engineering on Grace # 24-1pads and road entrance.
10.14.2008
< Sold load of oil on Grace # 24-1 >
Bulldozer moves to Grace # 24-1 to commence cleanup, filling pits, leveling pad.
10.13.2008
Grace # 24-1 running out of balance. Shut down, fix wrist pin, replace magneto, clean and restart. Observe till 8PM, leave location.
10.12.2008
Grace # 24-1 went down during night. Replace belts, perform motor check, start Pump back up, line out and observe.
10.11.2008
Bulldozer leveling location, finalizing pad on Grace # 25-6.
10.10.2008
Deliver and change out 55 gallons E-425 Emulsion Breaker and 55 gallons TVA to Grace # 25-4 well.
Deliver and change out 55 gallons E-421 Emulsion Breaker and 55 gallons TVA to Grace # 24-1 well.
Bulldozer filling in pits on Grace # 25-6.
Bulldozer on Grace # 25-5 finish filling in pit, move over to Grace # 25-6, park equipment.
10.9.2008
Bulldozer on Grace # 25-5 filling in pit, leveling location.
10.7.2008
< Sold load of oil on Grace # 25-4 >
White Metal Sandblasting crews working at Newby facilities cleaning and painting equipment. < Sold load of oil on Grace # 24-1 >
10.5.2008
Bulldozer working road entrance to Hunn # 3 and Hunn # 4.
10.4.2008
Bulldozer spreading fill on Hunn # 2, repairing ruts from storm.
White Metal Sandblasting continue clean, prep and paint surface equipment on Grace lease pump jacks and wellheads.
10.3.2008
Bulldozer continue to work on Hunn # 3, spreading Shale and cutting drainage.
Bulldozer applying Shale to build-up areas on Hunn # 3.
White Metal Sandblasting clean, prep and paint surface equipment on Grace pump jacks and wellheads.
10.2.2008
Grace # 25-4 made 28.39 BO & 38 MCF gas. Adjust Casing pressure to lower back pressure against system.
Deliver 7 loads of Shale & base material to Hunn # 2 and Hunn # 3.
White Metal Sandblasting clean and prep equipment on Grace lease.
9.30.2008
Grace # 24-1 made 8.35 BO. Grace # 25-4 made 25.88 BO & 39 MCF/D.
9.29.2008
Grace # 24-1 made 10.02 BO. Grace # 25-4 made 30.06 BO & 39 MCF/D. Dismantled Grace # 25-6 main shaft & callipered parts to get estimates for machining.
9.28.2008
Grace # 24-1 made 11.69 BO. Grace # 25-4 made 35.07 BO & 40 MCF/D. < Called in load of oil >
9.27.2008
Grace # 24-1 made 10.02 BO. Grace # 25-4 made 31.73 BO & 42 MCF/D.
9.26.2008
Semcrude oil transport truck 4067/2093 picks up load of oil from Newby # 6-2 Red Fork Production Tank # 50405, 10:50AM, BS&W 0.20%, Creek County, Oklahoma. Corrected API oil is 38.5 degrees.
[ Ticket # 1878485 ]
Semcrude oil transport truck 4067/2093 picks up load of oil from Newby # 6-1 Red Fork Production Tank # 48753, 12:26PM, BS&W 0.30%, Creek County, Oklahoma. Corrected API oil is 38.5 degrees. [ Ticket # 1878486 ]
Grace # 24-1 made 10.85 BO. Grace # 25-4 made 31.73 BO & 43 MCF/D.
9.24.2008
Pumper on Hunn Lease spends most of the day bringing wells back on, checking meters, lining wells out to make sure they don’t surge the system.
Grace # 24-1 made 10.02 BO. Grace # 25-4 made 32.56 BO & 46 MCF/D. Main Shaft on Grace # 25-6 Pump Jack snapped into pieces.
9.23.2008
Grace # 24-1 made 10.85 BO. < Sold load of oil > Grace # 25-4 made 35.07 BO & 48 MCF/D. <Called in load of oil> Also electric company will not turn on electric until Reda Cable is buried.
9.22.2008
Placed approved OCC Well I.D. signs on all Grace wells. )[ Totals ]
Grace # 25-1 made 22.54 BO (3.22 BOPD)
Grace # 24-1 made 73.48 BO (10.49 BOPD)
Grace # 25-4 made 236.30 BO (33.75 BOPD) & 44 MCF/D. Grace # 25-6 made 2.50 BO & 1.25 BWPD. ( Well is down due to Pump Unit Failure ) Total 136.94 BW (19.56 BWPD). Grace Lease Daily Production & Maintenance Log
9.20.2008
Grace # 25-4 made 47.59 BO & 55 MCF/Gas. Sold load of oil.
9.19.2008
Serviced all units on Grace lease.
9.18.2008
Grace # 24-1 = 11.69 BO / Called in load of oil.
9.17.2008
Got horses head repaired and delivered to Grace # 25-1. Put unit back together and running, back into sales.
With Winch Truck and lease crew, got beam back on Grace # 25-6. Start adjust and line out Pump Jack. Monitor.
9.16.2008
Deliver and change out 55 gallons E-425 Emulsion Breaker and 55 gallons TVA to Grace # 25-1 well, adjust & calibrate injector strokes.
Grace # 25-1 is down; Pins broke in horses head. Ordered pins.
Grace # 25-4 = 47.59 BO + 46 MCF/Gas. Sold short load of oil & opened choke to lower 350# casing pressure.
Grace # 24-1 = 9.18 BO < Ran Reda cable from meter to well, 1320’ connected both ends. Waiting on East Central Electric to install meter, and turn on electric.
9.13.2008
Semcrude oil transport truck 4080/2055 picks up load of oil from Newby # 6-1 Red Fork Production Tank # 48753, 19:43PM, BS&W 0.40%, Creek County, Oklahoma. Corrected API oil is 38.0 degrees. [ Ticket # 1632428 ]
Hunn Lease is shut down by another Enogex “force majeure event” (link), this one to have us selling no gas until September 23rd, at which time pumper will have to spend the day bringing wells back on line.
9.12.2008
2 Men and 1 Ton to Hunn # 34-4 to service Pump Jack engine. Change out 118-208 Magneto (exchange) and install and gap 4 - Champion D89D spark plugs.
9.10.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49606, 13:08AM, BS& W = 0.6% Okfuskee County, Oklahoma. Corrected API of oil is 40.5 degrees. [ Ticket # 1601470
Grace # 25-4 continues to make sand with flowback fluid. Cups are probably damaged and not getting good seal. Production fluctuates, last 24 hrs made 46.76 Bbls of oil, 70 MCF/Gas and the pressure is stable at 375#.
9.9.2008
Transport Walking Beam and innards for Pump Jack out to Grace # 25-6 location after over 30 days at Wolf Machine Shop in Seminole. Had to be completely overhauled. We cannot set it up because of thundershowers & lightning.
Semcrude oil transport truck picks up load of oil from Grace # 24-1 Red Fork Production Tank # -- 1 -- , 10:20AM, BS&W = 0.5% Okfuskee County, Oklahoma. Corrected API of oil is 25.0 degrees. [ Ticket # 285620 ]
Semcrude oil transport truck REJECTS load of oil from Grace # 25-4 Red Fork Prod Tank # 49606, 14:07PM, BS& W = 4.0%, 10” H2O Bottom Okfuskee County, Oklahoma. Corrected API oil is 40.0 deg. [ Ticket # 1821562 ]
9.8.2008
Lease Crew & 1 Ton Truck to Hunn Disposal well to check injectors, calibrate gauges and verify volumes. Replace 1 200# FF Gauge FM.
Lease Crew & 1 Ton Pole Truck to Hunn # 3 to change out 2” 125# back-pressure regulator and KimRay dump valves.
Lease Crew & 1 Ton Pole Truck to Hunn # 1 to change out 2” 125# Back-Pressure Regulator. Also, replace slipping knuckle joints with new knuckle jts.
Pump is slipping on Grace # 24-1 because production is down to 16 Bbls oil. Cups appear to be cut due to frac fluids and sand.
9.7.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49606, 10:36AM, BS& W = 0.3% Okfuskee County, Oklahoma. Corrected API of oil is 40.5 degrees.
[ Ticket # 1821553 ]
9.5.2008
Shut in Grace # 25-3 because it is making large amount of salt water. Will monitor it for shut in build up pressure for a week or so.
9.3.2008
Semcrude oil transport truck 4067/2093 picks up load of oil from Newby # 6-2 Red Fork Production Tank # 50404, 12:21PM, BS&W 0.30%, Creek County, Oklahoma. Corrected API oil is 36.8 degrees. [ Ticket # 1878425 ]
9.3.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49607, 11:44AM, BS& W = 0.2% Okfuskee County, Oklahoma. Corrected API of oil is 40.3 degrees. [ Ticket # 1691601
9.2.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-1 Red Fork Production Tank # 48430, 10:45AM, BS& W = 0.2% Okfuskee County, Oklahoma. Corrected API of oil is 37.6 degrees.
[ Ticket # 1691597 ]
9.1.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49607, 12:15AM, BS& W = 0.4% Okfuskee County, Oklahoma. Corrected API of oil is 41.3 degrees.
[ Ticket # 1691595 ]
8.31.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49606, 9:27AM, BS& W = 0.2% Okfuskee County, Oklahoma. Corrected API of oil is 41.5 degrees.
[ Ticket # 1691591 ]
8.29.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49607, 10:42AM, BS& W = 0.4% Okfuskee County, Oklahoma. Corrected API of oil is 37.6 degrees.
[ Ticket # 2557051 ]
8.28.2008
Semcrude oil transport truck # 4080 picks up load of oil from Newby # 6-1 Red Fork Production Tank # 48752, 20:16PM, BS& W = 0.2% Creek County, Oklahoma. Corrected API of oil is 39.0 degrees.
[ Ticket # 1632378 ]
Semcrude oil transport truck picks up load of oil from Grace # 24-1 Red Fork Production Tank # 1 , 12:03PM, BS& W = 0.2% Okfuskee County, Oklahoma. Corrected API of oil is 26.1 degrees. [ Ticket # 285923 ]
8.27.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-3 Red Fork Production Tank # 49607, 10:04AM, BS& W = 0.1% Okfuskee County, Oklahoma. Corrected API of oil is 41.3 degrees.
[ Ticket # 1691585 ]
8.22.2008
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49607, 20:57PM, BS& W = 1.0% Okfuskee County, Oklahoma. Corrected API of oil is 41.0 degrees.
[ Ticket # 1821498 ]
8.21.2008
Semcrude oil transport truck picks up load of oil from Grace # 24-1 Red Fork Production Tank # 1, ??? AM, BS& W = 0.4% Okfuskee County, Oklahoma. Corrected API of oil is 23.5 degrees. [ Ticket # 286284 ]
8.20.2008
Grace # 25-4 made 73.48 BO and 54 MCF/Gas. Well has 60# on tubing and 340# on casing.
Grace # 24-1 made 28.39 BO.
8.19.2008
Grace # 25-4 made 75.15 BO and 53 MCF/Gas. Well has 35# on tubing and 280# on casing, still flowing on its own. Sold 2 loads of oil from Grace # 25-4 and had electric service install lamp transformer @ well to run chemical pump.
Grace # 24-1 made 24.21 BO. Had tanker pull 12” water bottom off Grace #24-1 and top tank off out of the other. Put 16” of oil of 2nd tank into first to make full tank. Call in load.
8.18.2008
Grace # 25-4 made 82.66 BO and 29 MCF/Gas, flowing on its own overnight. Called in load.
Grace # 24-1 made 22.54 BO. Had to have propane delivered.
8.17.2008
Grace # 25-4 pumped off again and burned stuffing box, blew oil over location. Dispatch clean-up company, backhoe and tank truck for location clean-up. Well only made 4.19 BO and 29 MCF/Gas. Shut down pumping unit, by-pass, open well on small orifice to hold back pressure and let well flow on its own.
Grace # 24-1 made 22.54 BO. Purchaser rejected oil, high water bottom. Had chemical company come and check tank (12” black water bottom). Oil coming into stock tank is 120%. Chemical company adjust.
8.16.2008
Grace # 25-4 made 56.78 BO and 28 MCF because well had pumped off, burned stuffing box rubber and blew oil all over location. Had clean up crew come out and deliver, spread sand
Grace # 24-1 made 39.24 BO, call in load.
8.15.2008
Semcrude oil transport truck # 4068 picks up load of oil from Newby # 6-2 Red Fork Production Tank # 50405, 11:31AM, BS& W = 0.2% Creek County, Oklahoma. Corrected API of oil is 37.5 degrees.
[ Ticket # 1847224 ]
Semcrude oil transport truck # 4068 picks up load of oil from Newby # 6-1 Red Fork Production Tank # 48753, 09:53AM,BS& W = 0.2% Creek County, Oklahoma. Corrected API of oil is 37.5degrees. [ Ticket # 1847223 ]
Grace # 25-4 made 82.66 BO and 47 MCF/Gas.
Grace # 24-1 engine oiled over night and it shut in. Only made 9.18 BO.
8.14.2008
Here is important information from Semcrude about the disposition of oil sales that were withheld by SemCrude last month, due to their Chapter 11 Bankruptcy in July of 2008. For further status information contact the San Antonio office and ask for Rachel. Click here
Ken’s Hot Oil Service comes out of Earlsboro to Grace # 25-4 Tank Battery to agitate and hot oil and chemical treat 202 Bbls. Oil Tank because of initial contaminates. Took samples, brought oil into spec.
Pumping Jack Chemicals personnel out of Shawnee arrives at Grace # 25-4 to hook up Red Fork chemical injection pump and to place 28 gal E-425 Emulsion Breaker and 28 gal TVA to be injected into well stream to tanks.
Pumping Jack Chemicals personnel out of Shawnee arrives Grace # 24-1 to install Western Chemical Injection Pump LD-1, which will draw from 55 gal E-421, Emulsion Breaker and 55 gal TVA, configured with bleeder system, pump driver assembly.
Grace # 25-1 back to making 3.34 BOPD after we changed out bad joints tubing and put in a new bottom hole pump.
Semcrude oil transport truck picks up load of oil from Grace # 25-4 Red Fork Production Tank # 49607, 11:57AM, BS& W = 0.5% Okfuskee County, Oklahoma. Corrected API of oil is 41.3 degrees.
[ Ticket # 1601402 ]
8.13.2008
Semcrude oil transport truck # 4068 picks up load of oil from Newby # 6-2 Red Fork Production Tank # 50404, 11:21AM, BS& W = 0.2% Creek County, Oklahoma. Corrected API of oil is 37.2 degrees.
[ Ticket # 1847214 ]
Semcrude oil transport truck # 4068 picks up load of oil from Newby # 6-1 Red Fork Production Tank # 48752, 09:57AM, BS&W = 0.2% Creek County, Oklahoma. Corrected API of oil is 37.5 degrees.
[ Ticket # 1847213 ]
Semcrude oil transport truck picks up load of oil from Grace # 25-1 Red Fork Production Tank # 48429, 12:11AM, BS& W = 0.3% Okfuskee County, Oklahoma. Corrected API of oil is 37.7 degrees.
[ Ticket # 1771786 ]
Semcrude oil transport truck picks up load of oil from Grace # 25- 4 Red Fork Production Tank # 49607, 10:20AM, BS& W = 0.6% Okfuskee County, Oklahoma. Corrected API of oil is 41.0 degrees.
[ Ticket # 1771785 ]
Grace # 25-4 well made 151.97 Bbls oil and 77 MCF gas in 24 hrs as it continues to clean up from the fracture treatment. At 7PM perform 10 - 5 minute spot checks on well and it makes 3 – 5 Bbls oil per hour.
Grace # 24-1made 32.56 Bbls oil in 24 hrs. Brought chemical man out to check all new oil on the Grace # 24-1 tank battery and on the Grace # 25-4 tank battery. The full tanks at the Grace # 24-1 will have to be hot-oiled and that is scheduled and the tanks for the Grace # 25-4 will have to be treated with emulsion breaker.
8.12.2008
Grace # 24-1 made 25.05 Bbls oil in 24 hrs.
Strap tanks @ 7AM, Grace # 25-4 made 16.7 Bbls oil and 45MCF gas in 12 hrs. Strapped tank again @ 7PM, Grace # 25-4 made 76 Bbls oil in 12 hrs.
8.11.2008
Rig up Workover on Grace # 25-4, run tubing, rods and new pump into hole. Start motor @ 6PM, line everything from wellhead to facility out, monitor startup. Production start into tank at 7PM.
Had to get propane delivered to the Grace # 24-1 because it is not making enough gas on its own to run temporary gas engine pump jack. Well did make 20 Bbls of Oil overnight.
8.10.2008
Continue negotiations and approval process to switch to Sunoco as our oil Purchaser. Approved. Immediately schedule oil pickups for Newby lease and Grace lease.
8.9.2008
Begin negotiations with Sunoco to pick up our lease oil and replace SemCrude (who is in bankruptcy) as the Buyer of our Oklahoma crude.
Commence trenching for Grace # 25-6 and Grace # 24-1, flowlines and electric cable.
Grace # 25-1 made 5.85 Bbls of oil overnight after first full day with new pump and pressure tested and replaced tubing.
8.8.2008
Enogex begin work on their pipeline, which affects our Hunn Lease. Click here.
Move Workover Rig onto Grace # 25-4 well.
Continue to run back in Grace # 25-1 with new pump and pressure tested tubing, run rods and mud anchor, space out. Start motor, turn to sales. Move rig out to Grace # 25-4.
8.7.2008
Pressure test tubing on the Grace # 25-1 and located 4 bad joints. Replace, run back in hole with new pump.
8.6.2008
While Enogex has their pipeline and our Hunn lease shut down, Red Fork has contractors inspecting, pressure testing and calibrating our lease equipment. Perform total reconfiguring of discharge lines on the Hunn compressor, repair all the damaged valves caused by Enogex surge. Getting everything on our end ready, waiting on Enogex.
Grace # 25-4 well continues to clean up, flow on it’s own after fracture treatment. Tried once again to kill the well but couldn’t, so we will continue to let it flow into test tank. Oil/water ratio seems to be getting a spread on it now, and gas is increasing.
Strap Grace # 24-1 well, made 4.19 Bbls of oil and 25 Bbls of water. Seems to be operating fine, check entire system, adjust pump stroke, monitor for a time, leave location.
Move Workover Unit onto Grace # 25-1, rig up, pull rods and tubing. Lay them down on the test rack and pressure test. Locate and replace 4 bad joints. Run back in with rods and new pump. Rig down Workover unit and move back to Grace # 25-4.
On Grace # 25-4, rig up Workover unit, attempt to run in hole with tubing, rods, pump and mud anchor. Well is flowing, and we cannot run tubing. Flowline pressure is fluctuating between 80 and 100#! Hook up line to tank, see if it will bleed down. Leave to check on Grace # 24-1. Return @ 7PM, well still flowing with 40# on riser and still flowing. Sample at wellhead is heavy frac fluids, but does have some oil cut/sheen and trace gas.. Rig down Workover, move to Grace # 25-1.
1 Ton winch a 3 man lease crew out of Henryetta go to Stanford “B” Salt Water Disposal facility and repair damage sustained when Energex blew up sales line when bring their lines back on.
8.5.2008
Enogex announces that it is now in a position to bring back on production, so they instruct Pumpers to ready their wells, and the compressors. Bradshaw makes ready all his wells on the Hunn (which have been shut in for a week. The Enogex man is inexperienced and surges the wells, which subsequently come on to violently and blow the valves at the header to smitherines, with excess of gas surge and loss of control over production.
Bring in equipment to Grace # 25-4, spot Workover rig, secure well and location prepare well to rig up tomorrow. Leave location. (Last three days temps have been 100+ so we are conserving energy and avoiding heat stress).
Winch Truck and lease crew out of Okmulgee come to Grace # 25-6, disassemble and remove walking beam from pump jack, 4 hrs. Haul walking beam to machine shop in Seminole, 4 hrs.
Beam on Pump Jack on and take beam to Seminole to be machined. Grace # 25-6 will be down for a couple of days. Hopefully, it will be straightened and delivered back out to location by Thursday, and installed.
Move in crew, commence running iron into Grace # 24-1. Run in hole with tubing, rods, Mud Anchor and Pump. Start, balance and adjust rods and motor. Unit is performing well by 3PM, and is pumped up by 4PM. Rig down Workover Unit, move to Grace # 25-4 well.
8.4.2008
Move into Grace # 24-1 well, spot rig and get ready for post frac installation operations. Position tubing, rods and pump to be run in well.
8.3.2008
Deliver rebuilt and tested 1 ½ “ x 10’ Precision Barrel Pump and Plunger from Okmulgee to Grace # 24-1.
7.30.2008
Red Fork and other Operators notified that Enogex Gas Gathering is formally claiming a force majeure event and will last a minimum of three days. Repairs at the Fish Creek Compressor Station will require major repair, so all Operators affected must shut in their production, including Red Fork. (Click here)
7.29.2008
MIRU Basic Energy Services on the Grace # 25-4. Open well to bleed down pressure, well blows out 15’ stream of oil. Continue to try to shut well in, but oil keeps shooting out. Connect flow line from well head to frac tank and try to kill with 25 Bbls Saltwater @ 00#. Well still pressured up. Move in Bobtail truck, allow well to flow to tank. Connect frac head but SW continues to buck pressure and flow. Finally secure well, regain control. Resume fracture treatment on Gilcrease sand, 3,145 – 3,155’ through 4 ½” csg.. Pressure test lines to 1,000#. Finally commence and complete hydraulic fracture, injecting 10,000 lbs. of 12/20, 450 # G-50, 200 # Fla-2Fluid Loss, 278# Breaker flush. 3,500 Gals Gell w/40% salt Water Pad, Start 2,500 Gals Gell w/1,250# 20/40 sand ½ PPG,2,500 Gallons Gell with 2,500 # 20/40 sand @ 1 PPG Start 2,500 Gallons Gel with 3,750# 20/40 sand @ 1 ½ PPG ^ 1,638 Gallons Gell w/ 4,000# 20/40 sand @ 2 ½ PPG, start 49 Bbls gel salt water flush, Complete 351 Bbls ^^ Total ISIP = 750# ^^ 5 Min = 700# 10 Min = 700# 15 Min = 650 # Avg Injection Rate = 16.4 Bbls. / Avg Treatment Press. = 1,000 / Total Fluid Pumped = 351 Bbls / Maximum Pressure 1,000# / Minimum Pressure = 900# @ and 20/40 Ottawa sand and gel in median of 351 total Bbls of frac fluid, with a force of 1,050#. Shut in and secure well, rig down high pressure pump and transport equipment, leave location.
Move in to the Grace # 24-1, rig up high pressure pumps and hydraulic fracture treatment equipment, pressure test lines to 1,000#, commence injection at Booch sand through the 4 ½” Casing from 2,834 – 2,837’. Pump 5,000# 20/40 sand, 3,000# 12/20 sand, 300 # G-50 and flush with 150 # FLA-II, 20# Breaker F, 10 Gallons NE-3 and 10 Gallons CCA. Total fluid pumped 246 Bbls,from 900 – 1,k100# pressure. ISIP = 500# / / 5Min. = 450# / /10 Min = 400# / / 15 Min = 400 # Avg Injection Rate = 15 BPM. Avg Treatment Pressure = 900#
7.28.2008
Vacuum Transport Truck haul 2-70 Bbls loads salt water for frac job on Grace # 24-1 tomorrow.
Conducted pump test on Grace # 25-1 to see if production fall off due to mechanical problems. Took 30 strokes to get to 50#, which is unusual, so scheduling Pump Truck to pressure up on tubing to test for any holes. Pending those results will determine next action.
7.25.2008
Arrive Grace # 24-1 well, unpack well, pull 90 Jts 2 3/8” Tubing JTS out of hole, break head off, put swedge and valve on casing. Shut well in, secure well, rig down and load tools. Leave location.
7.24.2008
Move in and rig up Workover unit on the Grace # 24-1, pull and lay down tubing, rods, pump. Take pump to be shopped. Prepare well for hydraulic fracture treatment. Rig down Workover unit. Shut in, secure well.
7.23.2008
For your records, in June, Semcrude on paper is paying $133.2567 per barrel, and they collected a load of oil off the Grace # 25-1, a load of oil off the Grace # 25-3, a load of oil off the Newby 6-2, and three loads of oil off the Newby # 6-1. The Hunn # 34-4 well has started making oil, and there is enough to sell a load off of it, but we are letting all our tanks (each system has a two tank spillover reservoir so we can store oil) fill up before we call for a transport truck.
SemGroup, LP, the parent company of SemCrude, the purchaser of our oil in Oklahoma, announces that they have filed for Chapter 11 bankruptcy protection. This will affect us and most of the other Operators in Oklahoma as SemCrude is the largest purchaser of crude oil in the region. No other local companies in that business have the capacity to take up the slack, so we, like our colleagues, are in a position, at least temporarily, where we are at the mercy of the Delaware Bankruptcy Court, where this case is being deposed. More can be learned about this at the following Tulsa World site: click here for link
7.18.2008
Move in to the Grace # 24-1 with Workover rig and pull pump, tubing and rods out of well to prepare for a frac, scheduled for July 29, 2008. Prepare well for stimulation.
7.15.2008
Grace # 25-6 made 5.85 bbls oil. Install cattle panel around both wells, the Grace # 25-6 and the Grace # 24-1.
Cows shut off Propane, shut in Pump Jack on Grace # 24-1, and it made 1.67 bbls oil.
7.14.2008
Grace # 25-6 made 6.68 bbls of oil.
Closed in and framed spill burm around tank battery with Backhoe. Grace # 24-1 made 4.19 Bbls of oil and is still running on propane (used 6% in 24hrs.). Attempt to rig up # 24-1 to operate off it’s own gas. Jack runs till 3p.m., then locks up. Transfer well back to propane.
7.12.2008
Grace # 24-1 made 7.51 barrels of oil. Neither well is making any water.
Grace # 25-6 is building oil pad in gun barrel.
Got combination hook up plumbed in for the Grace # 25-6. Start unit @ 5p.m., pumped up at 6p.m. Unit is running 13 strokes per min. Also had water tank truck load gun barrel for Grace # 25-6! Set levels. 30# pressure on casing.
Vacuum Truck out of Okemah load south gun barrel on Grace Production facility, finished load out of water tank. (ticket # 1080)
7.11.2008
Finish gun barrel and stock tanks plumbing for Grace # 25-6. Trucks finished hauling gravel!
Grace # 24-1 made 5.01 bbls of oil before gas locked up. Deliver and install 250 gallon propane tank. Started up Pumping Unit with propane at 3 p.m.
7.10.2008
Started plumbing # 25-6 stock tanks.
Ran # 24-1 well 22hrs on propane. Well has about 20# pressure on casing. Switched engine to natural gas. Made 6.68 Bbls oil.
7.9.2008
Contractor delivers 202 tanks for Grace # 25-6 @ 10:30a.m. Got tanks unloaded, set and leveled. Installed walkways. Welder put new bottom in gun barrel for Grace # 25-6 facility. Set and level gun barrel.
Deliver 25 gal. propane bottle to Grace # 24-1. Started well @ 7:30 a.m., adjust, calibrate and monitor pump action.
7.8.2008
Start up Grace # 24-1 well @ 8AM and run it for 12 hours, monitoring pump action, and possible underground or facility leaks. Making adjustments to pump and pump action. Shut well in so as not to leave it unattended.
7.7.2008
Mount, balance, adjust and calibrate engines on Grace # 24-1 well and on Grace # 25-6 well. Start pump jack on # 24-1 well, has 110 psi initial casing surface pressure. Run # 24-1 well for two hours until well pumps up. From sample point at wellhead, fluid is dark, black oil. To the naked eye, measurement and shakeout sample appears to be 100% oil, no water. Pressure drops to 55 psi, shut down operations due to darkness.
7.5.2008
Complete and pressure test all welds from both wells to sales system. Welder extends base on pumping unit so C-66 Arrow gas motor can be installed.
7.3.2008
Finish burial and tie in of sales line from # 25-6 to facilities. Route and install inner facility plumbing, including water, oil and gas lines. Had to make one cut across lease road.
Pickup rocks, limbs and storm debris from Grace & Mackey leases after Thunderstorms.
Semcrude oil transport truck picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 50404, Creek County, Oklahoma. Corrected API of oil is 35.4 degrees. [ Ticket # 1920997 ]
7.2.2008
Deliver 14 Loads of Shale and build up base on Grace 24 lease roads.
Commence laying and welding lines to tank battery from Grace # 25-6 well. Truck in and spot pressure vessels and oil and water reservoir holding tanks for Grace # 25-6 well.
Vacuum Truck from Okemah travel to Hunn # 34-4 empty test tank. Travel to main facility and empty 202 Bbls tank and 100 Bbls tank and gun barrel. Haul 3-65 Bbls loads to Redfork disposal facility. Haul 65 Bbls to Cowan Disposal facility. (Ticket 1064) / Load water from water tank, load gun barrel w/40Bbls water. Haul 25 Bbls to Cowan Disposal (Ticket 1065).
7.1.2008
Deliver 10 Loads of Shale and build up base on Grace 24 (Mackey) lease roads.
6.30.2008
Deliver 11 Loads of Shale and build up base on Grace Lease roads.
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 11:15. Observed API of oil is 38.5 degrees. BS&W % = 2.00%
[ Ticket # 1632208 ]
Finish laying and welding lines in trench path, begin flow line wrap bury process Grace # 24-1 to production facility.
6.29.2008
Continue laying and welding lines from Grace # 24-1 well head to segregated sales facility.
6.28.2008
Deliver 12 Loads of Shale and build up base on Grace Lease roads.
Finish plumb work and configuration for separator, gun barrel, oil and water tanks (including manifolds) for the final hookup on Grace # 24-1 inlet. Begin laying and welding 9,000’ of line from well to gathering system.
6.27.2008
Continue work on Grace Number Two production facility. Got tanks set, leveled and reinforced for Grace # 24-1. Gravel trucks continue to bring in materials for infrastructure.
Deliver 8 Loads of Shale and build up base on Grace Lease roads.
6.26.2008
Deliver 10 Loads of Shale and build up base on Grace Lease roads.
Trenching operations finish up on the Grace 2 wells, from wellhead to gathering plant.
6.25.2008
Dozers finish with sales line right of way. Trenching operations continue to cut conduit from Grace # 24-1 and # 25-6 wells to production facilities.
Deliver 8 Loads of Shale and buildup base on Grace Lease roads.
6.24.2008
Commence major road upkeep and maintenance on Grace lease after severe storms, including 40 truckloads of shale and gravel for build-up work on reinforcing roads, shoulders, tin horn crossings and diversion ditches. This project ongoing from 6/24/08 through 7/9/08.
Bulldozers continue cutting right of way for sales line from Grace 25-6 and 24-1 wellheads to gathering system. Trenching machines begin to trench cradle for flowline.
6.23.2008
Completed civil engineering for Grace Two tank battery pads. Bulldozers clearing path and right of ways for sales lines stretching from Grace # 25-6 and Grace # 24-1 wells, to processing plant.
Deliver, spread 3 Loads of Shale on Hunn # 34-2 and Hunn # 34-3 roads.
6.20.2008
Dozers continue to build foundation pads, burms and drain paths for the Grace Two facilities, which will process hydrocarbons from the Grace # 25-6 well and the Grace # 24-1 well. Heavy rains
6.18.2008
Semcrude Transport Truck # 4130 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 14:08. Observed API of oil is 37.6 degrees. BS&W % = 0.30%
[ Ticket # 1130697 ]
Welders preparing fittings for Grace 2 segregated facility inlets, including two 202 Tanks and gun barrel tower.
6.17.2008
Rig up Workover unit on Hunn # 34-1 well, pull tubing, rods and pump to inspect pump and pump action.
6.16.2008
Move in Workover rig to Hunn # 34-4, install tubing, seating nipple, rods and pump. Connect Pump Jack, adjust and turn well on. Will clean up load water and remnants from acid treatment to sales. Rig down Workover rig, move to Hunn # 34-1 well.
6.14.2008
Semcrude oil transport truck picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 50404, Creek County, Oklahoma. Corrected API of oil is 35.6 degrees. [ Ticket # 1632007 ]
Semcrude truck # 4080 picks up load(s) of oil from Newby # 6-2, from Red Fork Production Tank # 50404, Creek County, Oklahoma @ 10:11AM. Observed API of oil is 37.5 degrees. BS&W% = 0.20%
[ Ticket # 1632145 ]
6.13.2008
Finish pulling tubing out of Hunn # 34-4, move in Electric Wireline unit, run in 8’ perforating gun, load hole with 25 Bbls Salt Water. Perforate Booch sand 2,167’ – 2,175’, 3 shots per foot. Run in hole with tubing and packer and perforated sub above packer. Set packer at 2,223’. Move in pump equipment, pump Salt Water and 10% Acid solution, shut in backside, pressure up to 1,000#, break formation back to 300#, commence pumping at 1.5 BPM rate @ 700#, increase rate to 3 BPM @ 900#, pressure decreasing to 600#. Instant shut in pressure (ISIP) 200#, 5 minutes on vacuum. Rig down pump equipment. Commence swabbing operations with Workover rig. Swab down to TD, slight show gas. Recovered 28 Bbls load. Shut in, secure well for build up.
Semcrude Transport Truck # 4131 picks up load(s) Grace # 25-1 oil, Red Fork Production Tank # 48429, Okfuskee Co., Oklahoma @ 11:54. Observed API of oil is 42.0 degrees. BS&W % = 0.20%
[ Ticket # 1820037 ]
6.12.2008
Move in Workover unit to Hunn # 34-4, pull rods and pump and tubing.
Return to Newby # 6-3, zero pounds pressure on surface, pull first swab. 1,000’ of dry gas before fluid hits, recover 40’ fluid, 20’ dark green oil, 20’ Salt Water. Wait 30 minutes for feed in, pull second swab, recover 20’ fluid, slight show oil and gas and load water. Wait 30 minutes, recover 20’ fluid, with show oil and gas. Shut well in, rig down Workover unit. Will leave well shut in to equalize reservoir before we schedule Acid stimulation job.
6.11.2008
Move in Workover unit to Newby # 6-3, run in swab fluid @ 850’. First swab 30’ oil, 170’ water, second swab 100 % Salt Water. Set 4- ½” temporary plug (CIBP) @ 3,762’ with Electric Line unit, perforate two feet of the Simson Dolomite (3,750 – 3,752’), four shots per foot with Casing gun. Fluid @ 3,400, pull swab, 20’ gas ahead of fluid. Second swab, pull from TD, no fluid entry, slight show gas. Shut well in, secure location.
6.4.2008
Semcrude truck # 4080 picks up load(s) of oil from Newby # 6-1, from Red Fork Production Tank # 48752, Creek County, Oklahoma @ 7:41AM. Observed API of oil is 38.5 degrees. BS&W% = 0.40%
[ Ticket # 1632089 ]
6.3.2008
Semcrude oil transport truck picks up load(s) of oil from Grace # 25-1, from Red Fork Production Tank # 48430, Okfuskee County, Oklahoma. Corrected API of oil is 34.8 degrees. [ Ticket # 1821302 ]
Semcrude oil transport truck picks up load(s) of oil from Grace # 25-3, from Red Fork Production Tank # 49606, Okfuskee County, Oklahoma. Corrected API of oil is 37.1 degrees. [ Ticket # 1821301 ]
Run in ¾” rods and pump to the Grace # 25-6. Rig down Workover unit. Cannot deliver Pump Jack or Tank Battery until ground dries.
6.2.2008
Move in Workover rig to Grace # 25-6. Deliver Tubing, Sucker Rods, Pony Rods, Pumping Tee, Mud Anchor, Stuffing box and other iron to location. Run 2 3/8” tubing, shut in well.
Zero pressure on Grace # 25-4 well. Rig up swab, run in hole and tag fluid @ 1,900’. First swab recover 300’ all oil, 2nd swab recover 300’ total, with 50’ of that oil. Swab again, recover 50’ per swab, 30% oil with good gas blow. Shut well in, rig down Workover Unit. Make arrangements for hydraulic fracture treatment. Swab operations recovered 5.5 Bbls. live oil. Secure well.
5.30.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 50405, Creek County, Oklahoma @ 10:58. Observed API of oil is 38.5 degrees. BS&W % = 0.20%
[ Ticket # 1632007 ]
Shut down wells going into Hunn lease compressor. Bleed down lines. Rig down gas compressor, evacuate lines and controllers. Install Electric Compressor and start Hunn lease wells up, one by one to pack new system; remove gas Compressor.
Zero pressure on Grace # 25-4 well. Run in hole with swab, tag fluid @ 50’. Move in and rig up for Acid Stimulation Treatment. Conduct Acid injection. Rig down, release pumping units. Swab to TD, recover @ 75’ fluid gas and oil show. Conduct several more swabs for a total of 71 Bbls. load recovered. Shut in, secure well.
5.29.2008
Construction crew to Hunn production facility to re-plumb, replace and pressure test reconfigured two-phase lease separator. Work on pad and level area. Simulate production and calibrate meters. Turn well back through and monitor functions.
Construction crew to DL Stanford “B” Salt Water Disposal Well to re-plumb SWD well, install weighted dump at tank and fix leak, install new parts.
Move in Workover Rig to Grace # 25-4 well. Pull tubing and rods. Move in Electric Line unit, set CIBP @ 3,275’. Perforate Gilcrease sand from 3,145’ to 3,155’. Rig down E-Line Unit. Swab well to TD. No show. Shut in well. Arrange for Acid Stimulation.
5.27.2008
Finish installing rods into Grace # 24-1 well. Set Pump Jack. Secure well, shut down because of thunderstorms.
5.23.2008
Move Workover unit into Grace 25-3 well to pull rods and tubing to inspect downhole motor. Discovered 11 bad joints with corrosion problems, holes in tubing. Install new tubing, pressure testing joints going in hole. Set Pump Jack.
Install tubing into Grace # 24-1 well, and begin running pump and rods into well. Build pad for and set Pumping Unit. Drag Workover unit out of location with Bulldozer. Secure well.
5.22.2008
Semcrude Transport Truck # 4004 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 11:22. Observed API of oil is 40.0 degrees. BS&W % = 0.80%
[ Ticket # 1878035 ]
Move in Workover unit to Grace # 24-1 well. Swab well dry to test tank. Move in, rig up Pump units, conduct Acid Stimulation job. Rig down pump units, hook up swab. Conduct swabbing operations. Secure well.
Grace # 25-6 well had 40# at surface. Open well, strong blow gas for 4 minutes. Tag fluid @ 850’ and pull 300’ on first pull, all oil. 2nd pull, 300’, 80% oil. Swabbing continues till evening, shut in well, rig down Workover unit.
5.21.2008
Rig up swab on Grace # 25-6 well, first swab recover 40’fluid green oil, 100’ gas ahead of swab. Rig up Pumping units for Acid stimulation job. Finish Acid job, rig down pump units, rig up for swab. Conduct swabbing operations. Bringing back acid, oil and gas; shut well in.
5.20.2008
Move in rig up Electric Wireline unit to the Grace # 24-1 well. Run Cement Bond Log. Rig up perforation gun, run in hole and perforate Booch Sand. Rig down Logging unit, shut in well.
Move in and rig up Electric Wireline unit on Grace # 25-6 well. Run Cement Bond Log and run Chlorine Log. Run in hole with Perforating guns and perforate Cromwell Sand. Move in Workover unit and swab well to 3,000’ into test tank. Dry, no fluid entry. Shut well in.
5.19.2008
Rig up Workover unit on Newby # 6-3. Swab well down to 3,200’ to test tank. Rig up perforation guns, run in hole and perforate Wilcox sand. Rig down Wireline. Swab well to tank. Shut in well for seep in equalization from Wilcox.
5.18.2008
Open Salt Water Disposal Well and hook up disposal lines to Hunn wells. Turn on Hunn wells again.
5.17.2008
Run in tubing and new packer to Salt Water Disposal Well, set packer at 2,905’. Inject acid treatment to clean out well. Rig down pump trucks, Workover Unit. Shut well in.
5.16.2008
Rig up 3 ¼” bit and casing scraper and ream down to 3,067’ on SWDW. Circulate hole clean. Pull tubing and scraper out of hole. Shut in.
5.15.2008
Continue try to retrieve old tubing and packer out of SWDW. Successfully remove old tubing and packer. Run new packer and tubing, but tag at 1,550’. Shut in well.
5.14.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 50404, Creek County, Oklahoma @ 12:19. Observed API of oil is 37.0 degrees. BS&W % = 0.20%
[ Ticket # 1632009 ]
Run in Salt Water Disposal Well and work all day with various methods. No luck.
5.13.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 08:38. Observed API of oil is 37.2 degrees. BS&W % = 3.00%
[ Ticket # 1632003 ]
Run in hole and try all day to retrieve bad tubing in various ways out of Salt Water Disposal Well; No luck again.
5.12.2008
Move in, rig up Workover unit onto Stanford B-1 Salt Water Disposal Well. Unable to unseat packer. Jar tubing, tubing parts. Try to pull bad tubing out of hole. Return tomorrow.
5.11.2008
Hunn wells shut in because Stanford B-1 Salt Water Disposal Well goes down.
5.10.2008
Run Cement Bond and Chlorine Log on Newby # 6-3 well.
5.1.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 08:53. Observed API of oil is 37.5 degrees. BS&W % = 0.20%
[ Ticket # 1631952 ]
4.31.2008
Build fence and hang gates around pits on Grace # 24-1.
4.29.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 50405, Creek County, Oklahoma @ 09:23. Observed API of oil is 36.5 degrees. BS&W % = 0.40%
[ Ticket # 1631942 ]
Arrive @ Test Depth, drilling complete on Grace # 24-1 well.
Move in Drilling Rig, spud and commence drilling Grace # 24-1 well.
Run Electric Logs, Cement Casing in Grace # 25-6 well.
4.20.2008
Arrive @ Test Depth, drilling complete on Grace # 25-6 well.
4.16.2008
Semcrude Transport Truck # 4130 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 12:31. Observed API of oil is 36.2 degrees. BS&W % = 0.80%
[ Ticket # 1130526 ]
Semcrude Transport Truck # 4130 picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 10:32. Observed API of oil is 35.8 degrees. BS&W % = 0.20%
[ Ticket # 1130525 ]
4.14.2008
Move in Drilling Rig, spud and commence drilling Grace # 25-6 well. Required two D-6 Bulldozers to drag rig and equipment through mud.
4.13.2008
Move in surveying team, identify spot for Grace # 24-1 well.
4.9.2008
Semcrude Transport Truck # 4130 picks up load(s) of oil from Newby # 6-2, Red Fork Production Tank # 01, Creek County, Oklahoma @ 10:32. Observed API of oil is 34.3 degrees. BS&W % = 0.30%
[ Ticket # 399576 ]
3.31.2008
Rig up Workover Unit on Hunn # 34-2, run new Pump and rods back in hole, seat and space out Pump. Hang well on Jack. Rig down.
Run Electric Logs, Cement Casing in Newby # 6-3 well.
3.30.2008
Arrive @ Test Depth, drilling complete on Newby # 6-3 well.
3.29.2008
Rig up Workover unit on Hunn # 34-2, swab frac fluids back. Run tubing back in hole, pack well off. Hook up and continue tubing swabs. Shut in well.
3.26.2008
Blow excess pressure off Hunn # 34-4 well. Rig up and conduct tubing swab to remove acid from wellbore. Run new Pump and rods back in hole, seat and space pump. Check pump action. Hang well on Jack.
3.25.2008
Conduct Hydraulic Fracture Treatment on Hunn # 34-2 well in Gilcrease formation.
Conduct Acid treatment on Hunn # 34-4 well in Gilcrease formation. Unload well into test tank. Install well head, run Mud Anchor, Seating Nipple and 94 Joints tubing back into well. Pack well off. Hook up and commence tubing swab operations. Recovered 45 Bbls Acid into test tank, shut in, secure well.
3.24.2008
Move W/O rig into Hunn # 34-4, pull tubing, rods and pump out of hole. Break head off casing, install swage and valve on casing. Shut well in. Prepare well for Acid treatment.
3.23.2008
Semcrude Transport Truck # 4080 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 12:59. Observed API of oil is 34.5 degrees. BS&W % = 2.00%
[ Ticket # 1631780 ]
3.21.2008
Move in Drilling Rig, spud and commence drilling Newby # 6-3 well.
3.12.2008
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 12:48. Observed API of oil is 33.6 degrees. BS&W % = 0.40%
[ Ticket # 1877763 ]
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 12:26. Observed API of oil is 33.6 degrees. BS&W % = 1.50%
[ Ticket # 1877762 ]
3.6.2008
Fill in Reserve pit on Newby # 6-1. Move over to Newby # 6-2, and fill in working pits, freshwater pits and continue building pad and retainer walls for tank battery.
3.4.2008
Hunn # 34-2 has 600 psi on wellhead; open choke and flow gas to sales.
3.1.2008
Continue to casing swab residual acid from Hunn # 34-2 well. Lower pump to tag bottom. Well is pumping into sales. Rig down.
2.29.2008
Semcrude Transport Truck # 4027 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 09:45. Observed API of oil is 36.5 degrees. BS&W % = 0.30%
[ Ticket # 1877714 ]
Semcrude Transport Truck # 4027 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 09:26. Observed API of oil is 36.5 degrees. BS&W % = 0.20%
[ Ticket # 1877713 ]
Move in Electric Wireline unit to Hunn # 34-2 well, set CIBP plug @ 2,970’, perforate Gilcrease sand with casing gun. Casing swab hole dry. Prepare well for and inject Acid treatment. Swab load back. Shut in, secure well, rig down equipment.
2.28.2008
Pump is stuck on Hunn # 34-2 well; move in Workover unit, attempt to unseat Pump, couldn’t. Place stripping tool on rods, strip rods and tubing out of holl. Install 4 ½ Orbit valve on casing. Shut well in.
Start Pump Jack on Hunn # 34-4, open to sales.
2.27.2008
Rig down and move out Workover Rig off of Newby # 6-2 well.
Move in Workover Rig to Hunn # 34-4, pump 25 Bbls salt water down casing to kill well. Run 94 Joints tubing in hole, pack well off. Run new pump and 119 ¾” rods in hole. Seat and space out pump. Check pump action. Hang well on Jack, rig down.
2.26.2008
Blow Newby # 6-2 down (into tank truck). Tally and run 121 Joining tubing in hole. Pack well off. Run new pump and rods into hole, seat and space out pump. Long stroke pump till well pressured up. Left location.
2.25.2008
Move Workover Rig onto Newby # 6-2, hook up and conduct casing swabs. Well kicked off, begins to flow. Lay down swab, shut in, secure well.
2.20.2008
Degge Transport Truck arrive at Newby # 6-1 and draws a total of 1’1” BS&W bottoms off from North and South Oil Holding Tanks for a total of 22 Bbls. Remove and dispose of same.
2.19.2008
Install wellhead on Hunn # 34-4, connect well to sales line. Open well to sales, flowing gas.
2.14.2008
Move Workover Rig onto Grace # 25-5 well, conducted casing swabs, cleaning out fluids. Shut in, secure well.
Continue to casing swab Acid out of Hunn # 34-4 well into test tank until clean. Broke Orbit valve off, installed swage and valve in casing. Rig down W/O Rig.
2.13.2008
Move Electric Line unit onto Hunn # 34-4, set CIBP, come uphole and perforate the Union Valley. Conduct acid job, swab fluids back. Secure well.
2.12.2008
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 36945, Creek County, Oklahoma @ 08:51. Observed API of oil is 32.8 degrees. BS&W % = 0.30%
[ Ticket # 351724 ]
Move W/O Rig onto Hunn # 34-4 well, pull pump, rods and tubing. Break tubing head off, install Orbit valve on casing. Secure well.
Continue casing test swabs on Newby # 6-2. Break off 4-½” Orbit Valve. Put swage and valve on casing. Shut well in.
Fill in working and reserve pits on the Hunn # 34-1 and Hunn # 34-4 locations.
2.11.2008
Move Workover Rig into Newby # 6-2, rig up and run casing swab. Install Orbit valve on casing. Swab well down to 3,000’, rig up Electric Wireline unit. Shot Perforations. Swabbed well back and test swabbed well. Shut well in.
1.28.2008
Semcrude Transport Truck # 4130 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 12:47. Observed API of oil is 33.6 degrees. BS&W % = 0.20%
[ Ticket # 1721055 ]
1.22.2008
Run Electric Logs, Cement Casing in Newby # 6-2 well.
1.21.2008
Arrive @ Test Depth, drilling complete on Newby # 6-2 well.
1.18.2008
Move back into Grace # 25-5 well. Zero pressure on surface. Rig up swab, run in hole. Hit fluid @ 2750’. Pull swab, @ 200’ influx; recover 2 Bbls. muddy Salt Water. Wait 30 Min, Run in hole, pull, recover @ 30’ muddy SW, 30 min recover @ 25’ muddy SW, no show of oil or gas. Shut in, secure well. Rig down Workover Unit.
1.17.2008
Move into Grace # 25-5 well and rig up Workover unit. Prepare well and commence swabbing operations w/4 ½” swab, swab well dry. Move in, rig up Duncan Acid Service. Pump 400 Gal 10% NE-FE mud cleanup acid. Let soak 10 min. Load hole w/40 BBL SW, Pressure up to 1600#, 1 min bleed to 300#, pressure up to 2000#, drop back. Pressure back to 2000#, formation breaks. Inject acid at 1½ BPM f/10 Bbls ISIP 560 PSI. Shut down. Flow back to tank @ 4 BBL.54 BBL total load. R/D pump and acid equipment, rig up Workover swab lines. Swab well down to 2975’ Shut in 6:15 PM. Recover 45 Bbls.load.
Unseat Pump, pull rods and pump out of Grace # 25-4. Run new Pump and rods back in hole, seat new pump, check pump action, hang well on Jack.
1.18.2008
Move back into Grace # 25-5 well. Zero pressure on surface. Rig up swab, run in hole. Hit fluid @ 2750’. Pull swab, @ 200’ influx; recover 2 Bbls. muddy Salt Water. Wait 30 Min, Run in hole, pull, recover @ 30’ muddy SW, 30 min recover @ 25’ muddy SW, no show of oil or gas. Shut in, secure well. Rig down Workover Unit.
1.16.2008
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 09:46. Observed API of oil is 34.5 degrees. BS&W % = 2.00%
[ Ticket # 1877513 ]
Rig up Workover Rig on Grace # 25-4 to ready hole.
Move in and rig up Anline logging with mast pole truck on Grace # 25-5 well. Set CIBP (cast iron bridge plug) @ 3330’. Rig up, pump 5 Bbls salt water to load hole. Arm casing guns, run in hole and Perforate Gilcrease sand 4 shots/foot from 3243.5 - 3246.5’. Pull out of hole, rig down Electric Line, shut in, secure well.
1.11.2008
Pull tubing swab on Grace # 25-5. Pulled tubing out of hole, brok head off, install orbit valve on casing; rig down.
1.10.2008
Move Workover Rig to Grace # 25-5, pull rods and pump out of hole; shut in well.
1.7.2008
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48752, Creek County, Oklahoma @ 08:58. Observed API of oil is 36.7 degrees. BS&W % = 0.60%
[ Ticket # 1877476 ]
Semcrude Transport Truck # 4067 picks up load(s) of oil from Newby # 6-1, Red Fork Production Tank # 48753, Creek County, Oklahoma @ 08:29. Observed API of oil is 36.7 degrees. BS&W % = 0.30%
[ Ticket # 1877474 ]
1.6.2008
Move in Drilling Rig, spud and commence drilling Newby # 6-2 well.