As a company, Red Fork Production is in the business of Resource Balancing. We are deeply affected by the balance of nature, both above ground and below. We work very closely with our land and our mineral owners, and are very careful to create a positive impact in our operations. We exercise more care and prudence than is expected of us by the various regulatory agencies, not because we are forced, but because we believe. We initiate, develop and maintain a mutually beneficial relationship with our surface and mineral resource partners. We are cognizant of their concerns, and we initiate many permanent improvements to their domain. In addition, all phases of our operations are geared toward protecting the Asset, and we exercise every practice to conserve and maximize reservoir drainage to achieve the greatest recovery of our planet’s scarce hydrocarbon reserves.
Operations Logs - 2010
7.30.2010
Move in, rig up Workover unit on Aurora # 10-1. While rigging up, scope out line broke and operations halted. Rig down W/O unit, secure well, leave location and return to yard to repair rig.
7.28.2010
Decision is made to pull out 2-3/8” tubing from the Aurora # 10-1 and install 2-7/8” tubing so we can move more fluid and theoretically get the well cleaned up faster, removing the water and allowing the oil access into the well bore. The current down hole pump bore of 1-1/2” will be replaced by a larger bore of 2-1/8”, which theoretically will allow over a hundred barrels of ADDITIONAL total fluid to flow from the reservoir.
7.21.2010
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.27.2010
Aurora # 10-1 is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) but it has also allowed 16.70 Bbls of oil to surface.
Vacuum truck travel to Grace # 25-4, clean up spill around well, finish load out of water tank, transport to and dispose of at public salt water disposal facility.
7.26.2010
Aurora # 10-1 is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) with over 200# back pressure holding back flow but well made .83 Bbls oil.
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.25.2010
Aurora # 10-1 is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) but the oil has not caught up so it made -0- Bbls oil from being shut down.
7.24.2010
Aurora # 10-1 shut in because supply gas from Wade well loaded up and stopped flowing. Got gas going again, started Aurora # 10-1 well back up.
7.23.2010
Sold 67.27 Bbls 33.2 degree API oil off Newby # 6-3.
Sold 108.56 Bbls 33.3 degree API oil off Newby # 6-2.
Aurora # 10-1 made 16.70 Bbls oil in about 15 hours, but still flowing large amounts of water with 220# injection back pressure.
7.22.2010
Lease crew travel to Pitchfork Ranch, empty and remove stock tank, transport to Aurora # 10-1, begin installation of tank and lines to backside. Work till 3 p.m., pressure test lines, start well back up, monitor flow and then leave location.
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.21.2010
Aurora # 10-1 has 30# on back side and is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) but the oil has not caught up so it made -0- Bbls oil from shut down. Bring in extra stock tank to plumb in line with transfer pump. Shut in Aurora # 10-1 and install in-line tank tomorrow.
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.20.2010
Vacuum truck travel to Newby # 6-2, remove 12” emulsified bottom off oil stock tank and take to public disposal.
Aurora # 10-1 is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) but the oil has not caught up so it made -0- Bbls oil from shut down.
7.19.2010
Aurora # 10-1 is still flowing large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well) but the oil has not caught up so it made -0- Bbls oil from shut down.
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.17.2010
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.16.2010
Sunoco Oil Transport truck travel to Newby # 6-2, test oil. 40% solids in suspension. Reject load.
Sold 159.62 Bbls 35.5 degree API oil off Newby # 6-1.
7.15.2010
Vacuum truck travel to Grace Lease, remove 65 Bbls salt water from stock tank, transport to and dispose of at public salt water disposal facility.
7.14.2010
Aurora # 10-1 made 16.70 Bbls oil, large amount of water, but flowing into Wade # 2 (Aurora Salt Water Disposal well) still carrying 220# injection back pressure.
Set, pressure test and turn production through new Gun Barrel on Grace # 25-3/4.
7.13.2010
Aurora # 10-1 made 2.5 Bbls oil, with lesser amt of water. Replaced radiator cap, started back up at 8AM.
Vacuum truck travel to Aurora # 10-1, pick up oil spill, empty Gun Barrel, haul 30 Bbls salt water to disposal facility.
7.12.2010
Aurora # 10-1 made -0- Bbls oil but lots of water from being down.
7.11.2010
Aurora # 10-1 made 18.37 Bbls oil for the week because it was down for several days and flush with salt water and had to catch up, pushing 210 Back Pressure still pushing 220# injection back pressure into Wade # 2 (Aurora Salt Water Disposal well).
7.10.2010
Aurora # 10-1 only made .83 Bbls oil but lots of water from being down. Still excessive back pressure going into Wade # 2 (Aurora Salt Water Disposal well).
7.09.2010
Lease crew travel to Aurora # 10-1 repaired water damage from floods and replaced kill switch. Started well back up at 9:45 a.m. and sit with well to monitor levels. Leave location.
Vacuum trucks travel to Grace Facility, haul 130 Bbls salt water load out of tank, transport to and dispose of at public disposal facility.
7.08.2010
Aurora # 10-1 down from flooding, kill switch broke off in block. Secure, schedule for maintenance and repair tomorrow.
7.07.2010
Aurora # 10-1 is down and inaccessible. Too messy to get to.
7.06.2010
Aurora # 10-1 made 5.85 Bbls oil, excessive water. Cows had knocked opened valve on Wade disposal well and made mess. Will have to install cattle corral.
Vacuum trucks travel to Grace Facility, haul 65 Bbls salt water load out of tank, transport to and dispose of at public disposal facility.
7.05.2010
Aurora # 10-1 made 6.68 Bbls oil, back pressure on disposal well still above 225#.
7.04.2010
Aurora # 10-1 made 4.17 Bbls oil, back pressure on disposal well still above 225#.
7.02.2010
Aurora # 10-1 made 3.34 Bbls oil, back pressure on disposal well still above 225#. Transfer oil from NW tank to SE tank.
7.01.2010
Aurora # 10-1 made 5.01 Bbls oil, back pressure on disposal well still above 225#.
Vacuum trucks travel to Grace Facility, haul 65 Bbls salt water load out of tanks and 65 Bbls rain water out of dikes, transport to and dispose of at public disposal facility.
6.30.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 225 psi. First measurable oil in stock tank = 3.34 Bbls.
6.29.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 200 psi. Aurora # 10-1 well filled up gun barrel with oil and it is spilling over and starting to put oil into stock tank.
6.28.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 200 psi.
Vacuum Truck travel to Grace # 25-6, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
6.27.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 225 psi.
6.26.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 250 psi.
6.26.2010
Sold 159.5 Bbls 36.0 API oil off Newby # 6-2.
6.25.2010
Aurora # 10-1 well continuing to flow large amounts of salt water into Wade # 2 (Aurora Salt Water Disposal well): Injection pressure = 250 psi.
6.24.2010
Deliver transfer pump to Wade # 2 (Aurora Salt Water Disposal well), install, test lines turn on and begin transfer water from tanks into disposal well to test system.
Vacuum Truck travel to Grace # 25-4, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
6.23.2010
Finalize gun barrel inspection on Grace # 25-3/4. Damage exceeds repair costs. Order new gun barrel.
6.22.2010
Vacuum truck travel to Newby # 6-2, remove emulsified bottom off oil stock tank.
Grace # 25-3/4 made 7.51 B/O in 19 hrs. Shut well in to inspect gun barrel. Vacuum truck empties gun barrel vessel for inspection. Remove 35 Bbls water and take to disposal.
6.21.2010
Move in, rig up Workover unit on Grace # 25-4. Pull rods and downhole pump out of well. Install new pump, run back in hole with rods and pump. Re-install head, space out, start Pump Jack, calibrate stroke, turn well to sales @ noon. Monitor operation for leaks, etc. Rig down Workover unit, secure well, leave location.
6.19.2010
Sold 161.81 Bbls 35.0 degree API oil off Newby # 6-1.
Install Red Fork panels around Aurora # 10-1 Pump Jack and well head.
Vacuum Truck travel to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Sunoco Oil Transport truck travel to Newby # 6-2, test oil. 30% solids in suspension. Reject load.
6.18.2010
On Grace # 25-4, move in tubing testers. Test and steam tubing. 19 joints of tubing and 40 rods did not pass. Move in, rig up Workover Rig. Run in hole with 14 new joints and rest of tested tubing. Pack well off; load pump, run in hole with 30 rods. Pump stacked out. Pull pump and rods back out of hole. Pump full of scale and debris. Run back in with pump, but pump would not install. Move in, rig up pump trucks for acid injection. Pump 500 gal 15% acid, let soak for 30 min. Flush with 30 Bbls salt water. Shut in, secure well. Load Pump and take to yard.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Sunoco rejects oil on Newby # 6-2. Schedule vacuum truck to remove emulsified bottom off tank.
6.17.2010
Vacuum trucks travel to Grace Facility, haul 6-65 Bbls loads out of tanks and around dikes, transport to and dispose of at public disposal facility.
6.16.2010
Crew drive to Grace # 25-4, stripped rest of rods and tubing out of hole. Had to cut some of the rods due to no screw off threads. Shut in, secure well, load tools, drive to yard.
6.14.2010
Pump truck travel to Grace # 25-4, assist lease crew and tubing testers to pressure test. Remove 19 bad joints, haul off 55 Bbls used salt water, transport to and dispose of at public disposal facility. Bring Workover unit to location, spot equipment, crew back to yard.
6.11.2010
Vacuum truck travel to Grace 25-4, vacuum oil and water spill from around well, clean location, dispose of hydrocarbonated materials.
6.10.2010
Vacuum truck travel to Grace Facility, clean tank # 2, empty dike, remove 65 Bbls salt water, transport to and dispose of at public disposal facility.
6.9.2010
Vacuum Truck travel to Newby # 6-2, skim oil from water tank and pump it into oil stock tank. Haul off 120 Bbls salt water to public disposal.
Vacuum Truck travel to Grace # 24-1, clean tanks 1 & 2 and haul 65 Bbls salt water to public disposal.
6.05.2010
Vacuum truck travel to Wade # 2 (Aurora Salt Water Disposal well), rig up, pressure test lines, conduct injection test. Pump 65 Bbls salt water down well at various rates, stabilizes at 350# at 2 Bbls/min. Rig down, secure well.
6.04.2010
Vacuum truck travel to Grace # 25-3/4, remove 130 Bbls salt water, transport to and dispose of at public disposal facility.
6.03.2010
Vacuum truck travel to Grace Production Facility, remove 195 Bbls salt water from dike, transport to and dispose of at public disposal facility.
6.01.2010
Vacuum truck travel to Grace # 25-3/4, remove 65 Bbls salt water, transport to and dispose of at public disposal facility.
5.31.2010
Pumper strap test Newby # 6-3, made 6.68 Bbls oil.
5.30.2010
Pumper strap test Newby # 6-2, made 5.01 Bbls oil.
5.29.2010
Pumper strap test Newby # 6-2, made 5.01 Bbls oil.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.27.2010
Pumper strap test Newby # 6-2, made 3.34 Bbls oil.
5.26.2010
Crew arrive Newby # 6-2. Rig up, run in hole with tubing, replacing bad joints. Pack well off. Run pump and rods back in hole. Load tubing with 3 vacuum truck loads Salt water. Check pump action. Hang well on. Re-install head, space out, start Pump Jack, calibrate stroke, turn well to sales. Monitor operation for leaks, etc. Rig down Workover unit, secure well, leave location.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.25.2010
Crew travel to Newby # 6-2. Load tubing with 3.5 vacuum truck loads Salt water. Long stroke pump, but no pump action, well went on vacuum. Pull rods and pump out of hole. Unpack well. Pull tubing out of hole to be tested. Exchange pump. Shut in, secure well. Leave location.
5.24.2010
Pumper strap test Newby # 6-3, made 8.35 Bbls oil.
Oil tanker to Newby # 6-1, extract 161.7 Bbls of 35.3 API sweet Oklahoma crude, take to market.
Move in, rig up Workover Rig on Newby # 6-2. Secure guide wires, well. Prepare for job tomorrow. Leave location.
Pressure equipment arrive on Wade # 1 (Aurora Salt Water Disposal Well), rig up lines. Pressure test lines and equipment, conduct acid fracture on subject disposal well. Pump 400 Gal 15% acid with solvents at 300 PSI to spot acid. Let soak, repeat procedure 3 times. Next, pump 1100 – 1200 PSI at 5.75 BPM. ISIP = 280 PSI. 5 Min SIP = 200 PSI.
5.21.2010
Vacuum Truck to Newby # 6-2 Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Move in, rig up pump truck on Wade # 1 (Aurora Salt Water Disposal Well). Pump 65 Bbls Salt water down tubing at 350 psi at 2 Bbls/Min rate. Shut in, secure well. Leave location
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.19.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.18.2010
Workover rig arrive on Wade # 1 (Aurora Salt Water Disposal Well), rig up. Open well and blow well stream into portable tank. Pumped 20 Bbls Salt water down tubing at 350 psi to create hydrostatic head. Run in hole with packer, seating nipple and 69 joints tubing. Seat packer at 2,162.68’. Pack well off. Vacuum truck picked up 15 Bbls Salt water, take to disposal well. Rig down workover rig, shut in, secure well.
5.17.2010
Pumper strap test Newby # 6-3, made 8.35 Bbls oil.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.14.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.12.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.11.2010
Pumper strap test Newby # 6-2, made 1.67 Bbls oil.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.10.2010
Pumper strap test Newby # 6-3, made 6.68 Bbls oil.
5.09.2010
Pumper strap test Newby # 6-2, made 1.67 Bbls oil.
5.06.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.04.2010
Pumper strap test Newby # 6-2, made 8.35 Bbls oil.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Vacuum Truck to Newby # 6-2 Production Facility, draw off 120 Bbls Salt water, transport to and dispose of at public disposal facility.
Workover Crew travel to Grace # 24-1. Check well and pump action. Rig down Workover Unit, return to base.
5.03.2010
Workover Crew travel to Newby # 6-2. Tally old and new tubing. Run good tubing back in hole. Pack well off. Run new pump and rods back in hole. Seat and re-space pump. Load tubing with salt water. Turn on pump. Adjust and calibrate pump action. Re-install head, space out, start Pump Jack, calibrate stroke, turn well to sales. Monitor operation for leaks, etc. Rig down, secure well, leave location.
Pumper strap test Newby # 6-3, made 8.35 Bbls oil.
Vacuum truck to Newby # 6-2. Load tubing with salt water. Leave location.
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
5.02.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
4.30.2010
Move in, rig up Workover unit on Newby # 6-2. Pull 119 Joints 2-3/8” Tubing and 135 ¾” rods and pump out of well. Lay down tubing to be pressure tested. Rig up, pressure test tubing; four joints burst. Rig down, secure well, leave location.
4.29.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Move in, rig up, pressure test tubing on Newby # 6-2. Eliminate busted pipes and replace with new tubing.
4.28.2010
Vacuum Truck to Grace # 24-1 well, load tubing with salt water after Workover Rig ran new pump.
4.27.2010
Move in, rig up Workover unit on Grace # 24-1. Pull 115-¾” rods and downhole pump out of well. Install new pump, run back in hole with rods and pump. Re-install head, space out, start Pump Jack, calibrate stroke, turn well to sales. Monitor operation for leaks, etc. Rig down Workover unit, secure well, leave location.
Move in, rig up Workover unit on Aurora # 10-2. Run in hole with swab, swab hole dry to TD. Rig up Electric Line, load hole with 10 Bbls. salt water, run in hole with perforating guns. Perforate Wilcox sand 3,447.25 – 3,448.75’ with 6 shots. Pull out of hole with gun. Rig up Workover Rig for swabbing operations, run back in hole and swab to TD X three, no fluid entry. Shut in, secure well, rig down Workover Rig, leave location.
4.26.2010
Sold 163.64 Bbls 35.2 API Oklahoma sweet crude off Newby # 6-1.
Newby # 6-3 made 8.35 BO.
Move into Aurora Salt Water Disposal well on Aurora lease with Workover Rig, rig up, hang tools. Hook tank truck to backside, pump 20 Bbls to kill well. Workover Rig pull 60’ 3-1/2” packer and then tubing out of hole. Broke head off. Install 4-1/2” Orbit Valve on Casing. Shut in, secure well, leave location. Haul 45 Bbls. Salt water back to public disposal facility.
4.24.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
4.23.2010
Move in, rig up Workover unit on Aurora Salt Water Disposal. Well head seized up, bring in Vacuum Truck, load casing with Salt water, welder cut ring and slips out of head, cut off well head. Pull out of hole with 8 Joints 2-3/8” tubing. Turned to 3-1/2” Packer Liner. Shut in, secure well. Leave location.
4.21.2010
Vacuum Truck to Grace Production Facility, draw off 130 Bbls Salt water, transport to and dispose of at public disposal facility.
4.19.2010
Newby # 6-3 made 6.68 BO.
4.16.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
4.14.2010
Move in, rig up Electric Line Unit on Aurora # 10-2. Run in hole, conduct Cement Bond Log. Pull out of hole, rig down E-Line. Log shows good cement bond from TD (3,500.15’) to 2,440’ (Top of cement 2,440’). Will submit logs & paperwork to OCC for Salt water disposal well permit.
Move in to Grace # 25-6, remove and install 55 gallons E-425 Emulsion Breaker and 55 Gallons TVA. Adjust and calibrate injection rate. Leave location.
4.13.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
4.12.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Newby # 6-3 made 8.35 BO.
4.08.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
4.07.2010
Move in to Newby # 6-1, remove and install 55 gallons E-425 Emulsion Breaker and 55 Gallons TVA. Adjust and calibrate injection rate. Leave location.
Vacuum Truck to Grace Production Facility, draw off 130 Bbls Salt water, transport to and dispose of at public disposal facility.
4.05.2010
Vacuum Truck to Grace Production Facility, draw off 65 Bbls Salt water, transport to and dispose of at public disposal facility.
Newby # 6-3 made 6.68 BO.
Workover Crew travel to Grace # 24-1. Rig up Workover Unit.
4.02.2010
Vacuum Truck to Grace Production Facility, draw off 130 Bbls Salt water, transport to and dispose of at public disposal facility.
4.1.2010
Topographic Land Surveyors draw final topographic map for Aurora # 10-2.
3.31.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
3.29.2010
Lease crew travel to Newby # 6-2, start to pull pump when well goes on strong vacuum. Pull pump, inspect, no visible defects. Rig up swab operations, run in hole with swab. No fluid in hole. Run pump back in hole, and hook up wellhead and surface assembly. Will wait a couple of days for well to equalize and turn around. Rig down Workover Unit, secure well, leave location.
3.28.2010
Sold 162.12 Bbls. 34.4 API Gravity Oil from Newby # 6-1.
3.26.2010
Vacuum truck travel to Grace Production facility, draw off 130 Bbls Salt Water, transport and dispose of at public disposal facility.
Well servicing crew return to Newby # 6-2, rig up Workover Unit, run tubing back in hole. Pack well off. Run new pump and rods back in hole. Seat pump. Load tubing with water. Well still will not pump. Pressure test tubing to 500 psi. Tubing holds pressure, passes test. Crew secure site & well, leave location.
Workover crew travel to Newby # 6-2, install new gas anchor and new pump. Load tubing, start pump jack. Not pumping. Will leave for a couple of days. Secure, prepare well, leave location.
3.25.2010
Workover crew travel to Newby # 6-2, rig up Workover Unit. Circulate Salt water down backside, flush unspent acid, pull rods and pump. Rods pasted with heavy paraffin. Try to run new pump but will not go through paraffin. Arrange for tubing high pressure steam cleaner. Pull 40 joints 2 3/8. Steam cleaners arrive, steam clean tubing. Crews secure well, leave location.
Hot Oil company travel to Newby # 6-2, rig up and commence steam cleaning tubing. Rig down, leave location.
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
3.24.2010
Move well servicing equipment into Newby # 6-2 location. Spot Workover rig, pipe racks, etc. Prepare well, secure, leave location.
3.23.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
3.21.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
3.19.2010
Vacuum truck travel to Grace Production facility, draw off 130 Bbls Salt Water, transport and dispose of at public disposal facility.
Sold 160 Bbls. 33.8 API Gravity Oil from Newby # 6-3.
3.17.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
3.16.2010
Sunoco hauls load of oil from Grace # 25-3 production facility.
3.15.2010
Vacuum truck travel to Aurora # 10-2 with 65 Bbls of fresh water for cement job.
Running logs, production casing on Aurora # 10-2. For more info, click here for DAY NINE drill report.
Sunoco hauls load of oil from Grace # 24-1 production facility.
3.14.2010
Drilling ahead, day eight on Aurora # 10-2. At 8 AM, depth is 3,705’. For more info, click here for DAY EIGHT drill report. To view Mud Log on-line, call office for instructions.
3.13.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
Drilling ahead, day seven on Aurora # 10-2. At 8 AM, depth is 3,635’. For more info, click here for DAY SEVEN drill report. To view Mud Log on-line, call office for instructions.
3.12.2010
Vacuum truck travel to Grace Production facility, draw off 130 Bbls Salt Water, transport and dispose of at public disposal facility.
Drilling ahead, day six on Aurora # 10-2. At 8 AM, depth is 3,375'’. For more info, click here for DAY SIX drill report. To view Mud Log on-line, call office for instructions.
3.11.2010
Drilling ahead, day five on Aurora # 10-2. At 8 AM, depth is 2,965’. For more info, click here for DAY FIVE drill report. To view Mud Log on-line, call office for instructions.
3.10.2010
Drilling ahead, day four on Aurora # 10-2. At 8 AM, depth is 2,100’. For more info, click here for DAY FOUR drill report. To view Mud Log on-line, call office for instructions.
3.9.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
Drilling ahead, day three on Aurora # 10-2. At 8 AM, depth is 2,100’. For more info, click here for DAY THREE drill report. To view Mud Log on-line, call office for instructions.
Lease crew travel to Newby # 6-2, start pump jack. Not pumping. Attempt several different techniques. Not getting pump action. Prepare well, leave location.
3.8.2010
Workover Rig arrive Grace # 25-3, Rig up, unpack well. Pull top 11 Joints back out of hole, tally pipe. Run 11 new joints back in hole. Seat and re-space pump. Load and pressure test tubing. Check pump action. Hang well on. Shut in, secure well, leave location.
Drilling ahead, day two on Aurora # 10-2. At 8 AM, depth is 1,125’. For more info, click here for DAY TWO drill report. Rigging up Mudlogging Unit to rig now. To view Mud Log on-line, call office for instructions.
Lease crew travel to Newby # 6-2, bleed pressure off backside. Start pump jack. Not pumping. Jar pump. Still not pumping, not getting pump action. Secure well, leave location.
3.7.2010
Drilling ahead, day one on Aurora # 10-2. At 8 AM, depth is 434’. For more info, click here for DAY ONE drill report.
3.6.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
Move in to Aurora # 10-2, Rig Up Drilling Rig.
3.5.2010
Vacuum truck travel to Grace Production facility, draw off 130 Bbls Salt Water, transport and dispose of at public disposal facility.
Pressure pump truck and crew travel to Grace # 25-3, pressure test tubing. 11 Joints exploded. Rig up Workover Rig, run tested and new tubing in hole. Run in hole with pump. Pump would not go. Try various methods. Pump still hangs up. Shut in, secure well, leave location.
Lease construction crews build up road to allow ingress for Drilling Rig to Aurora # 10-2.
Rig up equipment for Acid stimulation on Newby # 6-2. Load 40 Bbls lease crude oil, pressure up tbg to 300 psi. Shut in. Pump 125 gallons 10% acid down backside, 300 gallons oil, then 125 gallons acid. Pressure up backside from 200 – 1,400 psi @ 200 psi increments with 10 min pause between each stage. Slight bleed, possibly leaking by pump. After 3 hrs, pressure up backside to 1,400 psi, shut in and secure well. Rig down acid stimulation equipment, leave location.
3.4.2010
Workover Rig arrive Grace # 25-3, Rig up, pull rods and pump out. Blow casing down. Unpack well. Pull Tubing out of hole. Find split in 80th joint. Shut in, secure well, leave location.
Lease construction crews build up road to allow ingress for Drilling Rig to Aurora # 10-2. Bull Dozers constructing pad and pits and location for drill site.
3.3.2010
Pump Truck travel to Grace # 25-3. Load tubing with Salt Water after Workover Rig ran pump. Pressure test tubing. Haul 65 Bbls. Salt Water to disposal.
Lease construction crews build up road to allow ingress for Drilling Rig to Aurora # 10-2. Bull Dozers constructing pad and pits and location for drill site.
2.24.2010
Vacuum truck travel to Aurora Production facility, offload 65 Bbls Salt Water into
Gun Barrel.
2.23.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
2.23.2010
Sold 157.93 Bbls. 35.2 API Gravity Oil from Newby # 6-1.
2.22.2010
Sold 162.59 Bbls. 36.6 API Gravity Oil from Grace # 25-3/4.
2.16.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
2.09.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
2.07.2010
Sold 165.68 Bbls. 39.8 API Gravity Oil from Grace # 25-3/4.
Sold 163.52 Bbls. 23.3 API Gravity Oil from Grace # 24-1.
2.04.2010
Vacuum truck travel to Grace Production facility, draw off 65 Bbls Salt Water, transport and dispose of at public disposal facility.
1.31.2010
Grace Lease inaccessible due to snow and ice, blizzard conditions.
1.30.2010
Grace Lease inaccessible due to snow and ice, blizzard conditions.
1.29.2010
Grace Lease inaccessible due to snow and ice, blizzard conditions.
1.28.2010
Grace Lease inaccessible due to snow and ice, blizzard conditions.
1.27.2010
Grace Lease inaccessible due to snow and ice, blizzard conditions.
1.26.2010
Pull 120 Bbls Salt Water off Newby # 6-4 tank battery, transport to Public Disposal.
1.24.2010
Sold 141.5 Bbls of 36.1 Corrected API Oklahoma Sweet Crude Oil from Newby # 6-1.
Sold 137.42 Bbls of 35.9 Corrected API Oklahoma Sweet Crude Oil from Newby # 6-1.
Sold 40.15 Bbls of 36.3 Corrected API Oklahoma Sweet Crude Oil from Newby # 6-2.
Sold 36.07 Bbls of 36.3 Corrected API Oklahoma Sweet Crude Oil from Newby # 6-2.
1.23.2010
Pull 120 Bbls Salt Water off Newby # 6-1 tank battery, transport to Public Disposal.
1.15.2009
Vacuum Truck travel to Grace Lease, pull water bottom off Tank, haul 65 Bbls SW to Public Disposal.
1.13.2010
Vacuum Truck travel to Grace Lease, pull water bottom off Tank, haul 65 Bbls SW to Public Disposal.
1.10.2010
Vacuum Truck travel to Grace Lease, pull water bottom off Tank, haul 65 Bbls SW to Public Disposal.
1.9.2010
Pull 120 Bbls Salt Water off Newby # 6-1 tank battery, transport to Public Disposal.
1.8.2010
Vacuum Truck travel to Grace # 25-3, clean tank # 602, haul 25 Bbls SW to Public Disposal. .
1.4.2010
Vacuum Truck travel to Grace # 25-6, pull water bottom off Tank, haul 55 Bbls SW to Public Disposal.
Vacuum Truck travel to Grace Lease, pull water bottom off Tank, haul 55 Bbls SW to Public Disposal.